A.1 Introduction
A.2 Need and Benefits
A.3 Instructions
A.4 EAPR Questions
A.4.1 Project Overview (NPR 7120.5 Compliant)
A.4.2 Results of the Mission Directorate, Mission Support Office, or Center Capital Planning and Investment Control Process
A.6 Mapping to the NASA and FEA Models
A.7 Compliance with EA ?To-Be? State
A.8 IT Security Plan (Draft or Approved)
C.1 Introduction
C.2 Goals and Benefits
C.3 Portfolios
C.4 Instructions
C.5 What shall be included in the IT Investment Portfolio?
C.6 Who shall participate in the Process?
C.7 How to Apply Ratings
C.8 Using the Results
E.1 Approaches for Conducting Alternatives Analysis
E.2 Step 1: Analyze the Current Environment and Requirements
E.3 Step 2: Identify Future Environment Requirements
E.4 Step 3: Identify Viable Alternatives
E.5 Step 4: Conduct Cost Analysis for the Status Quo and Each Alternative
E.6 Step 5: Conduct Benefit Analysis for Each Alternative
E.7 Evaluate Economic Measures Among the Alternatives
E.8 Summary Analysis
This Document Is Uncontrolled When Printed.
Check the NASA Online Directives Information System (NODIS) Library to Verify that this is the correct version before use:
http://nodis3.gsfc.nasa.gov