|
NASA Procedural Requirements |
NPR 7120.9 Effective Date: March 11, 2011 Expiration Date: March 11, 2016 |
P.1 Purpose
P.2 Applicability
P.3 Authorities
P.4 Applicable Documents
P.5 Measurement/Verification
P.6 Cancellation
1.1 Overview
1.2 Document Structure
2.1 The NASA Chief Engineer
2.2 The Agency Chief Information Officer
2.3 Mission Directorates
2.4 The Chief, Safety and Mission Assurance
2.5 Center Directors
3.1 Security Architecture
3.2 Data Architecture
3.3 Information Support System Architecture
3.4 Process Architecture
3.5 PDLM Plan
D.1 Template Scope
D.2 Template Instructions
D.3 PDLM Plan Document Format and Content
D.4 Appendices
Figure D.3-1 PDLM Plan Title Page
Table D.3-1 PDLM Plan Revision and History Page