|
NASA Procedural Requirements |
NPR 8705.6B Effective Date: May 24, 2011 Expiration Date: May 24, 2016 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents
P.5 Measurement/Verification
P.6 Cancellation
1.1 Introduction
1.2 Objectives
2.1 Overview
2.2 Roles and Responsibilities
2.3 Institutional/Facility/Operational (IFO) Safety Audits
2.4 Quality Audit, Assessment, and Review (QAAR)
2.5 Requirement Flow Down and SMA Engineering Design Audits and Assessments (REDAA)
3.1 Overview
3.2 Roles and Responsibilities