[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 5900.1
Effective Date: October 28, 2003
Cancellation Date: April 08, 2014
Responsible Office: LP1

NASA Spare Parts Acquisition w/Change 2 (12/19/08)


ALL

Table of Contents

Change

Preface

P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 References
P.5 Cancellation

Chapter 1. Policy

1.1 Goal
1.2 Definitions
1.3 Spare Parts Acquisition

Chapter 2. Responsibilities

2.1 Program
2.2 Procurement
2.3 Logistics
2.4 Engineering

Chapter 3. Procedures

3.1 Initial Provisioning
3.2 Initial Provisioning Period
3.3 Replenishment
3.4 Life of Type Buys
3.5 Spares Acquisition Integrated with Production (SAIP)
3.6 Breakout
3.7 Technical Data
3.8 Pricing


DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov