NASA Procedures and Guidelines |
|||||
This Document is Obsolete and Is No Longer Used.
|
|||||
|
|||||
|
|
||||
| TOC | ChangeLog | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | ALL | |
AO Announcement of Opportunity
ATD Advanced Technology Development
BAR Basic and Applied Research
CDR Critical Design Review
CERR Critical Event Readiness Review
CM Configuration Management
CMM Capability Maturity ModelĀ«
CMMI Capability Maturity ModelĀ« IntegrationSM
CoF Construction of Facilities
ConR Continuation Reviews
DGA Designated Governing Authority
DR Decommissioning Review
ECP Engineering Change Proposal
ECR Environmental Compliance and Restoration
EEE Electrical, Electronic, and Electromechanical
EMC Electromagnetic Compatibility
EMI Electromagnetic Interference
EPR Engineering Peer Reviews
FAD Formulation Approval Document
FRR Flight Readiness Review
FS&GS Flight Systems and Ground Support
ICD Interface Control Document
ICWG Interface Control Working Group
INCOSE International Council on Systems Engineering
IP Institutional Projects
IPD Integrated Product Development
IPPD Integrated Product and Process Development
KDP Key Decision Point
KPP Key Performance Parameter
LLIL Limited Life Items List
MCR Mission Concept Review
MD Mission Directorates
MDAA Mission Directorate Associate Administrator
MDR Mission Definition Review
MOE Measures of Effectiveness
MOP Measures of Performance
MSO Mission Support Office
MSOD Mission Support Office Director
NODIS NASA On-Line Directives Information System
NPD NASA Policy Directive
NPR NASA Procedural Requirements
OCE Office of the Chief Engineer
ORR Operational Readiness Review
OSMA Office of Safety and Mission Assurance
PA Portfolio Approval
PAR Program Approval Review
PCA Program Commitment Agreement
PDR Preliminary Design Review
PFAR Post Flight Assessment Review or Post Flight Anomaly Records
PLAR Post Launch Assessment Review
PM Program or Project Manager
PMP Program Management Plan
PNAR Pre-Non-Advocate Review
PP Project Plan
PR Procedural Requirements
PRA Probabilistic Risk Assessment
PRR Production Readiness Review
P/SRR Program/System Requirements Review
PTR Periodic Technical Reviews
RFA Requests for Action
RFP Request for Proposal
RID Review Item Discrepancy
SAR System Acceptance Review
SDP Software Development Plan
SDR System Definition Review
SE Systems Engineering
SEMP Systems Engineering Management Plan
SE NPR Systems Engineering NASA Procedural Requirements
SEWG Systems Engineering Working Group
SIR System Integration Review
S&MA Safety and Mission Assurance
SP Special Publication
SRR System Requirements Review
TPM Technical Performance Measure
TRL Technology Readiness Level
TRR Test Readiness Review
V&V Verification and Validation
WBS Work Breakdown Structure
| TOC | ChangeLog | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | ALL | |
| NODIS Library | Program Formulation(7000s) | Search | |