| AOA | Analysis of Alternatives |
| AO | Announcement of Opportunity |
| EEE | Electronics, Electrical, and Electromechanical |
| FMEA | Failure Modes and Effects Analysis |
| FRB | Failure Review Board |
| IV&V | Independent Verification and Validation |
| KDP | Key Decision Point |
| LCC | Life-Cycle Costs |
| LCR | Life-Cycle Review |
| MAR | Mission Assurance Requirements |
| MDAA | Mission Directorate Associate Administrator |
| MDR | Mission Definition Review |
| MMOD | Micrometeoroids and Orbital Debris |
| M&P | Materials and Processes |
| NASA-STD | NASA Standard |
| NEPP | NASA Electronic Parts and Packaging |
| NPD | NASA Policy Directive |
| NPR | NASA Procedural Requirements |
| NSPM | National Security Presidential Memorandum |
| OSMA | Office of Safety and Mission Assurance |
| QA | Quality Assurance |
| QMS | Quality Management System |
| PRA | Probabilistic Risk Assessment |
| R&M | Reliability and Maintainability |
| SCD | Source Control Drawing |
| SDR | System Design Review |
| SMA | Safety and Mission Assurance |
| SMD | Science Mission Directorate |
| SMSR | Safety and Mission Success Review |
| SNS | Space Nuclear System |
| SPF | Single Point Failure |
| SRR | System Design Review |
| TA | Technical Authority |
| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL | |
| | NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.