| NODIS Library | Program Management(8000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 8705.4B
Effective Date: November 01, 2024
Expiration Date: November 01, 2029
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES
Printable Format (PDF)

Subject: Risk Classification for NASA Payloads

Responsible Office: Office of Safety and Mission Assurance


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL |

Appendix E. Assurance Implementation Matrix (AIM)

E.1 This Assurance Implementation Matrix is used by projects to:

a. Facilitate early discussions between the MDAA, Program/Project, and the TAs to reach agreement upfront around high-level SMA objectives, expected results, and corresponding approaches to meet those objectives commensurate with the established risk class(es).

b. Document their planned implementation consistent with the established risk class(es) and SMA objectives in Appendix D to inform more detailed SMA planning and implementation.

E.2 Mission Directorates may choose to invoke a MAR document on a program or project that serves as the baseline set of mission assurance requirements. If the OSMA has concurred with the Mission Directorate’s determination to invoke their MAR on a program or project, programs or projects achieve compliance with the invoked Mission Directorate MAR (e.g., SPD-39) in lieu of establishing an Assurance Implementation Matrix.

E.3 Instructions for completing each column of the AIM are as follows:

a. NPR 8705.4, Risk Tolerance Class Objectives and Approved Standards: Include the objectives and accepted standards provided in Appendix D corresponding with the risk tolerance class designated to associated mission or instrument.

b. Objective Satisfied (Y/N): Provide a “Yes” or “No” answer to whether the project plans to satisfy the corresponding objective provided.

c. Project Implementation: Document the project-specific implementation to satisfy the corresponding objective provided, including any approaches provided in the associated NASA-accepted standard(s).

d. Alternate Approaches and Standards: Include details for any alternate approaches or standards proposed and the related project-specific implementation to satisfy the corresponding objective provided.

Table E-1 Assurance Implementation Matrix

Topic in Appendix D of NPR 8705.4 NPR 8705.4 Risk Tolerance Class Objectives and Approved Standards Objective Satisfied (Y/N) Project Implementation Alternate Approaches and Standards
Range and Payload Safety
Reliability, Maintainability, and Fault Tolerance (including SPFs)
Environmental Test Program Verification and Validation
Electronics, Electrical, and Electromechanical (EEE) Parts
Materials
Telemetry Coverage for Critical Events
Quality Assurance and Quality Engineering
Software (including IV&V)
Risk Informed Decision Making (RIDM) and Continuous Risk Management (CRM) Processes
Nuclear Flight Safety
Orbital Debris Mitigation
Planetary Protection


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.