NASA Procedural Requirements |
NPR 8820.2G Effective Date: June 05, 2014 Expiration Date: September 30, 2022 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
1.1. Facility Program Content
1.2 Facility Program Best Practices
1.3 Sustainability Requirements
1.4 COF Program Formulation
2.1 Facility Project Development
2.2 Facility Project Planning
3.1 Design Coordination
3.2 Architectural-Engineering (A-E) Services
3.3 Public Release
3.4 Management of Design
3.5 Preliminary Engineering Report
3.6 Design Milestones
3.7 BIM Requirement
3.8 Design Reviews
3.9 Mission-Critical Systems
3.10 Facility Activation Plan
3.11 Activation Budget
4.1 Acquisition of Construction
4.2 Preparation of the Acquisition Package
4.3 Authority to Advertise
4.4 Receipt of Bids or Negotiation
4.5 Contract Award
4.6 Building Information Modeling
4.7 Construction Management
4.8 Real Property Capitalization
4.9 Project Closeout
5.1 Activation
5.2 Facility Outfitting
5.3 Beneficial Occupancy Prior to Completion
5.4 Completion And Acceptance of Installed Systems
5.5 O&M Manuals and Training
5.6 Commissioning
6.1 Demolition Plan
6.2 Demolition Planning Checklist
Figure 1-1a CoF Project Life Cycle
Figure 1-1b CoF Five-Year Plan
Figure 1-1c Institutional CoF Call and Programming Phase of Planning, Programming, Budgeting, and Execution System
Figure 1-2 CoF Program Management
Figure 1-3a Facilities Project Activities and Funding for Design-Bid-Build
Figure 1-3b Facilities Project Activities and Funding for Design-Build
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.