| NODIS Library | Program Management(8000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 8705.6D
Effective Date: March 29, 2019
Expiration Date: March 29, 2024
COMPLIANCE IS MANDATORY

(NASA Only)

Subject: Safety and Mission Assurance (SMA) Audits, Reviews, and Assessments

Responsible Office: Office of Safety and Mission Assurance


View all pages in PDF

Table of Contents

Preface

P.1 Purpose
P.2 Applicablity
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation

Chapter 1. Program Overview

1.1 Introduction
1.2 Objectives

Chapter 2. SMA Audits, Reviews, and Assessments

2.1 Overview
2.2 Roles and Responsibilities
2.3 SMA Audit, Review, and Assessment Requirements
2.4 Requirements Evaluation and Documentation Assessment & Analysis (REDAA)
2.5 Institutional, Facility, Operational Safety Audits (IFOSA)
2.6 Quality Audit, Assessment, and Review (QAAR)

Chapter 3. Safety and Mission Success Review (SMSR)

3.1 Overview
3.2 Roles and Responsibilities

Chapter 4. Safety Culture Assessments

4.1 Overview
4.2 Roles and Responsibilities

Appendix A. Definitions
Appendix B. Acronyms
Appendix C. Reference Documents
Appendix D. Table of minimum SMA Requirements Documents and Associated Audit, Review, and Assessment Requirements (this list is not all inclusive of the audit scope)


DISTRIBUTION:
NODIS


This Document Is Uncontrolled When Printed.
Check the NASA Online Directives Information System (NODIS) Library
to Verify that this is the correct version before use: http://nodis3.gsfc.nasa.gov