NASA Procedural Requirements |
NPR 8715.24 Effective Date: September 24, 2021 Expiration Date: September 24, 2026 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
1.1 Overview
1.2 Utilization of Current Scientific Consensus Throughout the Project Life Cycle
1.3 Planetary Protection Considerations for Participation in Partnered Missions
1.4 Delegation of Responsibilities
1.5 Request for Relief
2.1 Mission Directorate Associate Administrator
2.2 NASA Project Manager
2.3 Chief, Safety and Mission Assurance
2.4 Planetary Protection Officer
2.5 Project-Level SMA Technical Authority
3.1 Categorization and Planning
3.2 Verification, Assurance, and Pre-Launch Report Activities
3.3 Post-Launch/End of Mission
3.4 Restricted Sample Return and Containment
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.