NASA Procedures and Guidelines |
|||||
This Document is Obsolete and Is No Longer Used.
|
|||||
|
|||||
|
|
||||
| TOC | Change History | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | ALL | |
The VE Program will contribute to the overall Agency and contract management
objectives of streamlining operations and organizational structure,
improving quality and safety, reducing costs, and ensuring that environmentally
sound and energy-efficient practices and materials are considered in all
of NASA's decisions.
3.2.1 The Agency VE Manager, designated in NPD 5101.32, shall:
a. Carry out policies and practices set forth in OMB Circular No. A-131, Part 48 of the FAR, and Part 1848 of the NFS.
b. Monitor the VE Program, in coordination with the Program Associate Administrators, to ensure that a viable VE Program is established throughout NASA. Value engineering analysis during the early stages of design provide the greatest potential for savings.
3.2.2 Center Directors will designate a senior staff member to act as a focal point to monitor and advocate VE as it affects projects, programs, systems, and product development under their cognizance.
3.2.3 The Center VE focal points are responsible for:
a. Assisting the VE Manager in meeting the objectives of the VE Program.
b. Ensuring that a VE clause is included in NASA solicitations and contracts, as required by FAR Subpart 48.2 and NFS Subpart 1848.2.
c. Actively eliciting Value Engineering Change Proposals (VECP) from contractors whose contracts contain a VE clause. Value Engineering Change Proposals will be promptly processed and objectively evaluated in accordance with NFS 1848.103.
| TOC | Change History | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | ALL | |
| NODIS Library | Procurement, Small Business and Industrial Relations(5000s) | Search | |