NASA Procedures and Guidelines |
|
This Document is Obsolete and Is No Longer Used.
|
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
1.1 Background
1.2 Framework for Systems Engineering Procedural Requirements
1.3 Framework for Systems Engineering Capability
1.4 Document Organization
2.1 Roles and Responsibilities
2.2 Tailoring and Customization
3.1 Introduction
3.2 Requirements for the Common Technical Processes
4.1 Introduction
4.2 Activities Prior to Contract Award
4.3 During Contract Performance
4.4 Contract Completion
5.1 Life Cycle
5.2 Life-cycle and Technical Review Requirements
5.3 Completion of Life-cycle Reviews
6.1 Systems Engineering Management Plan Function
6.2 Roles and Responsibilities
H.1 Compliance Matrix for Centers
H.2 Compliance Matrix for Programs/Projects
Figure 1-1 - Hierarchy of Related Documents
Figure 1-2 - Documentation Relationships
Figure 1 3 - SE Framework
Figure 3 1 - Systems Engineering (SE) Engine
Figure 3-2 - Application of SE Engine Common Technical Processes Within System Structure
Figure 5 1 - NASA Uncoupled and Loosely Coupled Program Life Cycle
Figure 5-2 - NASA Tightly Coupled Program Life Cycle
Figure 5-3 - NASA Single-Project Program Life Cycle
Figure 5 4 - The NASA Project Life Cycle
Figure A-1 - Enabling Product Relationship to End Products
Figure C 1 - Stakeholder Expectation Definition Process
Figure C 2 - Technical Requirements Definition Process
Figure C 3 - Logical Decomposition Process
Figure C-4 - Design Solution Definition Process
Figure C 5 - Sequencing of Product Realization Processes
Figure C 6 - Product Implementation Process
Figure C 7 - Product Integration Process
Figure C 8 - Product Verification Process
Figure C 9 - Product Validation Process
Figure C 10 - Product Transition Process
Figure C 11 - Technical Planning Process
Figure C-12 - Requirements Management Process
Figure C-13 - Interface Management Process
Figure C-14 - Technical Risk Management Process
Figure C-15 - Configuration Management Process
Figure C-16 - Technical Data Management Process
Figure C 17 - Technical Assessment Process
Figure C 18 - Decision Analysis Process
Figure D-1 - Systems Engineering Management Plan Title Page
Table 5-1 - SE Product Maturity
Table G-1 - SRR Entrance and Success Criteria for a Program
Table G-2 - SDR Entrance and Success Criteria for a Program
Table G-3 - MCR Entrance and Success Criteria
Table G-4 - SRR Entrance and Success Criteria
Table G-5 - MDR/SDR Entrance and Success Criteria
Table G-6 - PDR Entrance and Success Criteria
Table G-7 - CDR Entrance and Success Criteria
Table G-8 - PRR Entrance and Success Criteria
Table G-9 - SIR Entrance and Success Criteria
Table G-10 - TRR Entrance and Success Criteria
Table G-11 - SAR Entrance and Success Criteria
Table G-12 - ORR Entrance and Success Criteria
Table G-13 - FRR Entrance and Success Criteria
Table G-14 - PLAR Entrance and Success Criteria
Table G-15 - CERR Entrance and Success Criteria
Table G-16 - PFAR Entrance and Success Criteria
Table G-17 - DR Entrance and Success Criteria
Table G-18 - Disposal Readiness Review Entrance and Success Criteria
Table G-19 - Peer Review Entrance and Success Criteria
Table G-20 - PIR/PSR Entrance and Success Criteria