AO | Announcement of Opportunity |
ASM | Acquisition Strategy Meeting |
CD | Center Director |
CDR | Critical Design Review |
CERR | Critical Events Readiness Review |
CIO | Chief Information Officer |
CM | Configuration Management |
CMM | Capability Maturity ModelĀ® |
CMMI | Capability Maturity ModelĀ® IntegrationSM |
COTS | Commercial off the shelf |
CPR | Center Procedural Requirements |
CPU | Central Processing Unit |
DGA | Designated Governing Authority |
DR | Decommissioning Review |
DRR | Disposal Readiness Review |
ECP | Engineering Change Proposal |
EEE | Electrical, Electronic, and Electromechanical |
EMC | Electromagnetic Compatibility |
EMI | Electromagnetic Interference |
ETA | Engineering Technical Authority |
FA | Formulation Agreement |
FAD | Formulation Authorization Document |
FRR | Flight Readiness Review |
GOTS | Government off the shelf |
HSIP | Human Systems Integration Plan |
ICD | Interface Control Document |
ICWG | Interface Control Working Group |
ILSP | Integrated Logistics Support Plan |
IMS | Integrated Master Schedule |
IP | Institutional Projects |
IPD | Integrated Product Development |
IPPD | Integrated Product and Process Development |
IT | Information Technology |
JCL | Joint Confidence Level |
LRR | Launch Readiness Review |
LV | Launch Vehicle |
KDP | Key Decision Point |
KPP | Key Performance Parameter |
MCR | Mission Concept Review |
MD | Mission Directorate |
MDAA | Mission Directorate Associate Administrator |
MDR | Mission Definition Review |
MOE | Measures of Effectiveness |
MOP | Measures of Performance |
MOTS | Modified off the shelf |
MRR | Mission Readiness Review |
MSO | Mission Support Office |
MSOD | Mission Support Office Director |
NID | NASA Interim Directive |
NODIS | NASA On-Line Directives Information System |
NPD | NASA Policy Directive |
NPR | NASA Procedural Requirements |
NTIA | National Telecommunications & Information Administration |
OCE | Office of the Chief Engineer |
ORR | Operational Readiness Review |
OSMA | Office of Safety and Mission Assurance |
PCA | Program Commitment Agreement |
PDLM | Product Data and Life-cycle Management |
PDR | Preliminary Design Review |
PFAR | Post-Flight Assessment Review |
PIR | Program Implementation Review |
PLAR | Post-Launch Assessment Review |
PM | Program or Project Manager |
PMC | Program Management Committees |
PRA | Probabilistic Risk Assessment |
PRR | Production Readiness Review |
PSR | Program Status Review |
RF | Radio Frequency |
RFA | Request for Action |
RFP | Request for Proposal |
RID | Review Item Discrepancy |
SandMA | Safety and Mission Assurance |
SAR | System Acceptance Review |
SDR | System Definition Review |
SE | Systems Engineering |
SEMP | Systems Engineering Management Plan |
SE NPR | Systems Engineering NASA Procedural Requirements |
SIR | System Integration Review |
SMSR | Safety and Mission Success Review |
SP | Special Publication |
SRB | Standing Review Board |
SRR | System Requirements Review |
TA | Technical Authority |
TBD | To Be Determined |
TBR | To Be Resolved |
TPM | Technical Performance Measure |
TRL | Technology Readiness Level |
TRR | Test Readiness Review |
USC | United States Code |
VandV | Verification and Validation |