[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 7123.1B
Eff. Date: April 18, 2013
Cancellation Date:

NASA Systems Engineering Processes and Requirements (Updated w/Change 4)

| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | ALL |


Appendix B. Acronyms

AO Announcement of Opportunity
ASM Acquisition Strategy Meeting
CD Center Director
CDR Critical Design Review
CERR Critical Events Readiness Review
CIO Chief Information Officer
CM Configuration Management
CMM Capability Maturity ModelĀ®
CMMI Capability Maturity ModelĀ® IntegrationSM
COTS Commercial off the shelf
CPR Center Procedural Requirements
CPU Central Processing Unit
DGA Designated Governing Authority
DR Decommissioning Review
DRR Disposal Readiness Review
ECP Engineering Change Proposal
EEE Electrical, Electronic, and Electromechanical
EMC Electromagnetic Compatibility
EMI Electromagnetic Interference
ETA Engineering Technical Authority
FA Formulation Agreement
FAD Formulation Authorization Document
FRR Flight Readiness Review
GOTS Government off the shelf
HSIP Human Systems Integration Plan
ICD Interface Control Document
ICWG Interface Control Working Group
ILSP Integrated Logistics Support Plan
IMS Integrated Master Schedule
IP Institutional Projects
IPD Integrated Product Development
IPPD Integrated Product and Process Development
IT Information Technology
JCL Joint Confidence Level
LRR Launch Readiness Review
LV Launch Vehicle
KDP Key Decision Point
KPP Key Performance Parameter
MCR Mission Concept Review
MD Mission Directorate
MDAA Mission Directorate Associate Administrator
MDR Mission Definition Review
MOE Measures of Effectiveness
MOP Measures of Performance
MOTS Modified off the shelf
MRR Mission Readiness Review
MSO Mission Support Office
MSOD Mission Support Office Director
NID NASA Interim Directive
NODIS NASA On-Line Directives Information System
NPD NASA Policy Directive
NPR NASA Procedural Requirements
NTIA National Telecommunications & Information Administration
OCE Office of the Chief Engineer
ORR Operational Readiness Review
OSMA Office of Safety and Mission Assurance
PCA Program Commitment Agreement
PDLM Product Data and Life-cycle Management
PDR Preliminary Design Review
PFAR Post-Flight Assessment Review
PIR Program Implementation Review
PLAR Post-Launch Assessment Review
PM Program or Project Manager
PMC Program Management Committees
PRA Probabilistic Risk Assessment
PRR Production Readiness Review
PSR Program Status Review
RF Radio Frequency
RFA Request for Action
RFP Request for Proposal
RID Review Item Discrepancy
SandMA Safety and Mission Assurance
SAR System Acceptance Review
SDR System Definition Review
SE Systems Engineering
SEMP Systems Engineering Management Plan
SE NPR Systems Engineering NASA Procedural Requirements
SIR System Integration Review
SMSR Safety and Mission Success Review
SP Special Publication
SRB Standing Review Board
SRR System Requirements Review
TA Technical Authority
TBD To Be Determined
TBR To Be Resolved
TPM Technical Performance Measure
TRL Technology Readiness Level
TRR Test Readiness Review
USC United States Code
VandV Verification and Validation


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | ALL |
 
| NODIS Library | Program Formulation(7000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov