[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8705.6C
Eff. Date: January 09, 2017
Cancellation Date:

Safety and Mission Assurance (SMA) Audits, Reviews, and Assessments

| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | AppendixA | AppendixB | AppendixC | AppendixD | ALL |


Appendix B. Acronyms

AAO Audits and Assessments Office
CAP Corrective Action Plan
FRR Flight Readiness Review
IFOSA Institutional, Facility, Operational Safety Audit
IV&V Independent Verification and Validation
JPL Jet Propulsion Laboratory (a Federally Funded Research and Development Center)
MRB Mission Readiness Briefing
NASA National Aeronautics and Space Administration
NASA-STD NASA Standard
NESC NASA Engineering and Safety Center
NPD NASA Policy Directive
NPR NASA Procedural Requirements
NSC NASA Safety Center
OSMA Office of Safety and Mission Assurance
PVS Pressure Vessels and Pressurized Systems
PRA Probabilistic Risk Assessment
QAAR Quality Audit, Assessment, and Review
R&M Reliability and Maintainability
REDAA Requirements Evaluation and Documentation Assessment & Analysis
SAARIS Surveys, Audits, Assessments, Reviews Information System
SMA Safety and Mission Assurance
SMSR Safety and Mission Success Review
TA Technical Authority


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | AppendixA | AppendixB | AppendixC | AppendixD | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov