A&E | Architect and Engineer |
A/C | Air-Conditioning |
APQC | American Productivity and Quality Council |
ASQ | American Society for Quality |
AWP | Annual Work Plan |
BCI | Building Cost Index |
BMAR | Backlog of Maintenance and Repair |
CADD | Computer Aided Design and Drafting |
CFC | Chlorofluorocarbons |
CFO | Chief Financial Officer |
CMMS | Computerized Maintenance Management System |
CoF | Construction of Facilities |
COSS | Center Operations Support Services |
COTR | Contracting Officer's Technical Representative |
CRV | Current Replacement Value |
DESC | Defense Energy Support Center |
DM | Deferred Maintenance |
EMCS | Energy Monitoring and Control System |
ENR | Engineering News Record |
EPA | Environmental Protection Agency |
EPS | Engineered Performance Standards |
FAR | Federal Acquisition Regulation |
FCA | Facility (Facilities) Condition Assessment |
FCI | Facility Condition Index |
FEJE | Facilities Engineering Job Estimating |
FM | Facility Management |
FMS | Functional Management System |
FY | Fiscal Year |
GIS | Geographic Information System |
GSA | General Services Administration |
HQ | NASA Headquarters |
HVAC | Heating, Ventilating, and Air-Conditioning |
IDIQ | Indefinite Delivery/Indefinite Quantity |
IPO | Institutional Program Office |
IRT | Infrared Thermography |
IT | Information Technology |
JSC | Johnson Space Center |
LCD | Liquid Crystal Display(s) |
LEED | Leadership in Energy and Environmental Design |
M&R | Maintenance and Repair |
MADR | Maximum Allowable Defect Rate |
MCA | Motor Circuit Analysis |
MCE | Motor Circuit Evaluation |
MIL-STD | Military Standard |
MOA | Memorandum of Agreement |
MSDS | Material Safety Data Sheet |
MSI | Maintenance Support Information |
NASA | National Aeronautics and Space Administration |
NPD | NASA Policy Directive |
NPDES | National Pollutant Discharge Elimination System |
NPR | NASA Procedural Requirements |
NRC | National Research Council |
NSN | National Stock Number |
O&M | Operations and Maintenance |
OMB | Office of Management and Budget |
OSHA | Occupational Safety and Health Administration |
P&E | Planning and Estimating (or Planner and Estimator) |
PBC | Performance-Based Contract(ing) |
PEC | Performance Evaluation Committee |
PGM | Programmed Maintenance |
PM | Preventive Maintenance |
POC | Point of Contact |
POP | Program Operating Plan |
PRS | Performance Requirements Summary |
PT&I | Predictive Testing and Inspection |
PUC | Public Utility Commission |
PWS | Performance Work Statement |
QA | Quality Assurance |
QAE | Quality Assurance Evaluator |
R&D | Research and Development |
RCB&EA | Reliability Centered Building and Equipment Acceptance |
RCFA | Root-Cause Failure Analysis |
RCM | Reliability Centered Maintenance |
ROI | Replacement of Obsolete Items |
RTP | Real-Time Pricing |
SOP | Standard Operating Procedure |
SOW | Statement of Work |
SR | Service Request |
TC | Trouble Call(s) |
WBS | Work Breakdown Structure |
WCC | Work Control Center |