| NODIS Library | Property, Supply and Equipment(4000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 4200.1G
Effective Date: March 30, 2010
Expiration Date: March 30, 2015
COMPLIANCE IS MANDATORY
Printable Format (PDF)

(NASA Only)

Subject: NASA Equipment Management Procedural Requirements

Responsible Office: Logistics Management Division


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | ALL |

Appendix E: Acquisition Methods in the NASA PP&E System

E.1 The following is the drop down table that is displayed with the match code icon for the Acquisition Method:

If Receipt is Then Select
Purchased by NASA 01 - Receipt by Purchase - NASA funded
Purchase by another Government Agency on behalf of NASA 02 - Receipt by Purchase - OGA Funded
Transferred from a NASA Installation 04 - Receipt by Transfer - From NASA Installation
Transferred from another Government Agency 05 - Receipt by Transfer - From OGA
Transferred from a Contractor 06 - Receipt by Transfer - From Contractor
Lease in 08 - Receipt from Lease In
Loan in 09 - Receipt from Loan In
Fabrication 10 - Receipt from Fabrication
Assembly or Disassembly
Example: An item that has to be assembled.
11 - Receipt from Assembly/Disassembly
Found on Station 12 - Receipt from Found on Station
Excess 13 - Receipt from Excess
Retagging 14 - Receipt from Retagging
Transfer of Real to Personal Property 16 - Receipt from Transfer of Real to Personal Property
Non-Government source
Example: Unsolicited equipment, donation
17 - Receipt from Non-Government Source
Not previously meeting criteria for tagging
Example: Piece of equipment that did not meet the criteria for being tagged, but does now.
18 - Receipt from Not Previously Meeting Criteria for Tagging
Reinstating item previously surveyed
Example: The equipment was lost, stolen, missing, etc. and then found.
19 - Receipt from Reinstating Item Previously Surveyed
Lease to a purchase
Example: The equipment was leased and during the lease term it was decided to purchase the equipment.
21 - Receipt Resulting from Conversion of Lease to Purchase


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | ALL |
 
| NODIS Library | Property, Supply and Equipment(4000s) | Search |

DISTRIBUTION:
NODIS


This Document Is Uncontrolled When Printed.
Check the NASA Online Directives Information System (NODIS) Library
to Verify that this is the correct version before use: http://nodis3.gsfc.nasa.gov