|
NASA Procedural Requirements |
NPR 8570.1 Effective Date: March 15, 2001 Expiration Date: June 15, 2013 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 References
P.5 Cancellation
1.1 Energy Efficiency and Water Conservation
1.2 Agency Goals
1.3 Current Energy Uses and Trends
1.4 Reserved.
1.5 Center and Component Facility Responsibilities
2.1 Energy-Consuming Facilities Definitions
2.2 Reporting Requirements
2.3 Metrics
3.1 The Energy Efficiency and Conservation Management Program
3.2 Center Energy Efficiency and Water Conservation 5-Year Plan
3.3 The Energy Manager
3.4 The Energy Efficiency Team (EET)
3.5 Gathering Background Information
3.6 Budgeting and Programming Projects
3.7 Developing Awareness Programs
3.8 Monitoring Programs Effectiveness Through Metering
4.1 The Energy Audit
4.2 Types of Audits
4.3 Reserved.
4.4 Reserved.
4.5 Reserved.
4.6 Reserved.
4.7 Reserved.
4.8 Reserved.
4.9 Life-Cycle Costing
5.1 Facilities Maintenance
5.2 Facilities Operations
5.3 0&M Checklist
6.1 Technology Requirements
6.2 Reserved.
6.3 Heating, Ventilating, and Air Conditioning (HVAC)
6.4 Lighting
6.5 Reserved.
6.6 Reserved.
6.7 Reserved.
6.8 Reserved.
6.9 Reserved
6.10 Reserved.
6.11 Reserved.
6.12 Reserved.
8.1 Introduction
8.2 Reserved.
8.3 Water Conservations Requirements
8.4 Reserved.
8.5 Reserved.
8.6 Reserved.
8.7 Reserved.
8.8 Reserved.
8.9 Water Conservation Program
8.10 Reserved.
9.1 The ESPC Concept
9.2 Statutory Requirements
9.3 DOE's Super ESPC Program
9.4 Establishing the Baseline
9.5 Performance Guarantee and Contractor Payments
9.6 Measurement and Verification (M&V) Procedures
10.1 UESC
10.2 DSM Programs