[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8621.1
Eff. Date: June 02, 2000
Cancellation Date: February 11, 2004

NASA Procedures and Guidelines for Mishap Reporting, Investigating, and Recordkeeping

| TOC | ChangeHistory | Preface | Chp1 | Chp2 | Chp3 | Chp4 | Chp5 | Chp6 | All-Appendices | AppdxA | AppdxB-All | AppdxB1 | AppdxB2 | AppdxB3 | AppdxB4 | AppdxC | AppdxD | AppdxE-All | AppdxE1 | AppdxE2 | AppdxF-All | AppdxF1 | AppdxF2 | AppdxF3 | AppdxG | AppdxH-All | AppdxH1 | AppdxH2 | AppdxH21 | AppdxH3 | AppdxH4 | AppdxH5 | AppdxH6 | AppdxH7 | AppdxI-All | AppdxI1 | AppdxI2 | AppdxI3-All | AppdxI31 | AppdxI32 | AppdxI33 | AppdxI34 | AppdxI35 | AppdxJ-All | AppdxJ1 | AppdxJ2 | AppdxJ3 | AppdxJ4 | AppdxJ5 | AppdxJ6 | AppdxJ7 | AppdxJ8 | AppdxJ9 | AppdxJ10 | AppdxJ11 | AppdxK | AppdxL | AppdxM | Cover | ALL |


Appendix J-9. Maintenance and Inspection Checklist
1.        Develop Preliminary Assessment of Operations in Progress at the Time of the Mishap ...........................................................................................____

2.        Develop Preliminary Assessment of Hardware in Use at the Time of the Mishap ...................................................................................................____

3.        Develop Preliminary Assessment of the Environment Which Preceded the Mishap .................................................................................................____

4.        Assure All System/Facility/Vehicle Records are Impounded ..................................................................................................................................____

           a) Maintenance Records .....................................................................................................................................................................................____
           b) Inspection Records .........................................................................................................................................................................................____
           c) Nondestructive Evaluation Records (x-rays, etc.) .............................................................................................................................................____
           d) Design Modification Requirements and Status ..................................................................................................................................................____

5.        Assess System Maintenance Records for Evidence of Chronic Failures or Adverse Trends ....................................................................................____

6.        Assess Maintenance Procedures as Required for Adequacy .................................................................................................................................____

7.        Assess Inspection Records for Evidence of Discrepancy Trends ...........................................................................................................................____

8.        Assess Inspection Procedures and Frequencies for Adequacy ..............................................................................................................................____

9.        Assess Nondestructive Evaluation Records .........................................................................................................................................................____

           a) X-ray Analysis
           b) Ultra-Sound Analysis
           c) Neutral Particle Beam Analysis
           d) Pressure System Certification Tests
           e) Bench Tests
           f) Material Lot Certifications
           g) Spectrometer Tests

10.        Evaluate Systems Design Status .......................................................................................................................................................................____

             a) Evaluate Recent Design Modifications Incorporated
             b) Evaluate Design Modifications Required But Not Implemented
             c) Assess Any Unauthorized or Unapproved Modifications Found on System(s)




| TOC | ChangeHistory | Preface | Chp1 | Chp2 | Chp3 | Chp4 | Chp5 | Chp6 | All-Appendices | AppdxA | AppdxB-All | AppdxB1 | AppdxB2 | AppdxB3 | AppdxB4 | AppdxC | AppdxD | AppdxE-All | AppdxE1 | AppdxE2 | AppdxF-All | AppdxF1 | AppdxF2 | AppdxF3 | AppdxG | AppdxH-All | AppdxH1 | AppdxH2 | AppdxH21 | AppdxH3 | AppdxH4 | AppdxH5 | AppdxH6 | AppdxH7 | AppdxI-All | AppdxI1 | AppdxI2 | AppdxI3-All | AppdxI31 | AppdxI32 | AppdxI33 | AppdxI34 | AppdxI35 | AppdxJ-All | AppdxJ1 | AppdxJ2 | AppdxJ3 | AppdxJ4 | AppdxJ5 | AppdxJ6 | AppdxJ7 | AppdxJ8 | AppdxJ9 | AppdxJ10 | AppdxJ11 | AppdxK | AppdxL | AppdxM | Cover | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov