[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8705.5A
Eff. Date: June 07, 2010
Cancellation Date: December 09, 2022

Technical Probabilistic Risk Assessment (PRA) Procedures for Safety and Mission Success for NASA Programs and Projects (w/Change 2)

| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | ALL |


Appendix A. Acronyms

CDR Critical Design Review
FRR Flight Readiness Review
IPR Independent Peer Review
KDP Key Decision Point
MDR Mission Definition Review
NPR NASA Procedural Requirements
NPD NASA Policy Directive
ORR Operational Readiness Review
OSMA Office of Safety and Mission Assurance
PMC Program Management Council
PRA Probabilistic Risk Assessment
RIDM Risk-Informed Decision Making
R&M Reliability and Maintainability
SDR System Definition Review
SMA Safety and Mission Assurance


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov