[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8705.5A
Eff. Date: June 07, 2010
Cancellation Date: December 09, 2022

Technical Probabilistic Risk Assessment (PRA) Procedures for Safety and Mission Success for NASA Programs and Projects (w/Change 2)

| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | ALL |


Appendix B. References

B.1 NPD 1000.3, The NASA Organization.

B.2 NPD 1440.6, NASA Records Management.

B.3 NPR 7123.1, NASA Systems Engineering Processes and Requirements.

B.4 NPR 8000.4, Agency Risk Management Procedural Requirements.

B.5 Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners, https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20120001369.pdf.

B.6 Presidential Directive/National Security Council Memorandum Number 25 (PD/NSC-25), Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and the Launch of Nuclear Systems into Space.

B.7 NASA Cost Estimating Handbook (2008) (http://ceh.nasa.gov/ceh_2008/2008.htm).

B.8 NASA/SP-2007-6105, NASA Systems Engineering Handbook.



| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov