A/E or A-E | Architect-Engineer |
AA | Associate Administrator |
ABA | Architectural Barriers Act |
ADA | Americans with Disabilities Act |
ADPM | Agency Demolition Program Manager |
AED | Automated External Defibrillators |
AFPCE | Approved Facility Project Cost Estimate |
AHJ | Authority Having Jurisdiction |
AMP | Agency Master Plan |
ANSI | American National Standards Institute |
ARC | Ames Research Center |
ARPA | Archeological Resources Protection Act |
ARRA | American Reinvestment and Recovery Act (2009) |
ASBCA | Armed Services Board of Contract Appeals |
ASHRAE | American Society of Heating, Refrigeration, and Air-Conditioning Engineers |
ASTM | American Society for Testing Materials |
ATF | Armstrong Test Facility (Component Facility, Glenn Research Center) |
BCA | Building Commissioning Association |
BIM | Building Information Model or Modelling |
BIPV | Building-Integrated Photovoltaics |
BMP | Best Management Practices |
BTU | British Thermal Units |
BY | Budget Year |
CA | Commissioning Authority |
CAD | Computer-Aided Design |
CAM | Control Account Manager |
CAS | Cross Agency Support (fund/budget term) |
CatEx | Categorical Exclusion |
Cat C | Category C Project |
CBM | Condition-Based Maintenance (or Continuous-Based Monitoring) |
CCB | Change Control Board |
CCE | Current Cost Estimate |
CCI | Consolidated Contract Initiative |
CCTV | Closed Circuit Television Systems |
CDF | Capitalization Determination Form |
CDPM | Center Demolition Program Manager |
CECR | Construction, Environmental Compliance and Restoration (Fund that includes Institutional and Programmatic CoF; and Environmental) |
CEQ | Council on Environmental Quality |
CFIP | Capitol Facilities Investment Program |
CFO | Chief Financial Officer |
CFR | Code of Federal Regulations |
CII | Construction Industry Institute |
CIPP | Capital Improvement Program Plan |
CJ | Congressional Justification |
CMc | Construction Manager as Constructor |
CM&O | Center Management and Operations |
CMMS | Computerized Maintenance Management System |
CMr | Construction Manager At Risk |
CNM | Center NEPA Manager |
CO | Change Order or Contracting Officer |
COBie | Construction-Operations Building Information Exchange |
CoF | Construction of Facilities |
COR | Contracting Officer's Representative |
COSS | Center Operations Support Services |
CPARS | Contractor Performance Assessment Reporting System |
COTR | Contracting Officer Technical Representative |
CPG | Comprehensive Procurement Guidelines |
CPM | Critical Path Method |
CR | Continuing Resolution |
CRM | Cultural Resource Manager (previously Historic Preservation Officer) |
CRV | Current Replacement Value |
CSI | Construction Specification Institute |
CUI | Controlled Unclassified Information |
Cx | Commissioning |
CY | Calendar Year |
DB | Design-Build (contract) |
DBT | Design-Basis Threat |
DFRC | Dryden Flight Research Center |
DHS | Department of Homeland Security |
DMA | Deferred Maintenance Assessment |
DoD | Department of Defense |
DOE | Department of Energy |
DSN | Deep Space Network (Component Facility, JPL) |
EA | Environmental Assessment |
ECIC | Engineering and Construction Innovation Committee |
EC&R | Environmental Compliance and Restoration |
EDD | Environmental Due Diligence |
EE | Engineering Estimate |
EEO | Equal Employment Opportunity |
EIS | Environmental Impact Statement |
EISA | Energy Independence and Security Act |
EMCS | Energy Management Control Systems |
E.O. | Executive Order |
EPA | Environmental Protection Agency |
EPACS | Enterprise Physical Access Control Systems |
EPM | Executive Project Manager |
EPR | Estimated Price Report |
ESA | Exploration, Science and Aeronautics or Endangered Species Act |
ESCO | Energy Service Company |
ESPC | Energy Savings Performance Contract |
EUL | Enhanced Use Lease (or Leasing) |
EVM | Earned Value Management |
EXC | Exploration Capability |
FAD | Funding Approval Document |
FAI | Federal Acquisition Institute |
FAR | Federal Acquisition Regulation |
FASAB | Federal Accounting Standards Advisory Board |
FCP | Facility Closure Plan |
FEMP | Federal Energy Management Program |
FEP | Front-End Planning |
FERP | Facilities Engineering and Real Property Division |
FF&E | Fixtures, Finishes and Equipment |
FMEA | Failure Modes and Effects Analysis |
FMM | Financial Management Manual |
FMP | Facilities Master Plan |
FMS | Facilities Management System |
FONSI | Finding of No Significant Impact |
FP&D | Facility Planning and Design |
FPB | Facilities Program Board (now defunct) |
FPM | Facility Project Manager |
FPMP | Facility Project Management Plan |
FPN | Facility Project Number |
FPR | Facility Project Requirements or Facility Project Review |
FPT | Functional Performance Tests |
FRB | Facilities Review Board (now defunct) |
FRD | Facility Requirements Document |
FRED | Facilities and Real Property Division (NASA Headquarters) |
FSC | Federal Supply Catalog |
FS&GS | Flight System and Ground Support |
FSMP | Facility Safety Management Plan |
FUO | Facility Utilization Officer |
FURB | Facility Utilization Review Board |
FY | Fiscal Year |
G&A | General and Administrative |
GBA | Green Building Advisor |
GBI | Green Building Institute (for Green Globes) |
GFE | Government-Furnished Equipment |
GFP | Government-Furnished Property |
GIS | Geospatial Information System |
GMP | Guaranteed Maximum Price |
GRC | Glenn Research Center |
GSA | General Services Administration |
GSE | Ground Support Equipment |
GSFC | Goddard Space Flight Center |
HASP | Health and Safety Plan |
HABS | Historic American Buildings Survey |
HAER | Historic American Engineering Record |
HSF | Human Space Flight |
HQ | Headquarters (NASA) |
HUD | U. S. Department of Housing and Urban Development |
HVAC | Heating, Ventilation, and Air-Conditioning |
IAQ | Indoor Air Quality |
IBC | International Building Code |
ICC | International Code Council |
IDIQ | Indefinite Delivery, Indefinite Quantity |
IDS | Intrusion Detection System |
IEQ | Indoor Environmental Quality |
IESNA | Illuminating Engineering Society of North America |
IFB | Invitation for Bid |
IOP | Integrated Operations Plan or Initial Operating Plan |
ISC | Interagency Security Committee |
ISDL | Institutional Safety Discipline Leads |
IST | Integrated Systems Test |
IT | Information Technology |
IV&V | Independent Verification and Validation Facility (Component Facility, GSFC) |
JOFOC | Justification for Other than Full and Open Competition |
JPL | Jet Propulsion Laboratory |
JSC | Johnson Space Center |
KDP | Key Decision Points |
KIC | Knowledge Information Center |
KSC | Kennedy Space Center |
LAPM | Local Authority Project Manager (unique to KSC) |
LaRC | Langley Research Center |
LCCA | Life-Cycle Cost Analysis |
LEED | Leadership in Energy and Environmental Design |
LLIS | Lessons Learned Information System |
LS | Lump Sum |
M&O | Maintenance and Operations |
MACC | Multiple Award Construction Contract |
MAF | Michoud Assembly Facility (Component Facility, MSFC) |
MRC | Minor Revitalization and Construction |
MRI | Mission Relevancy Index (Replaces Mission Dependency Index - MDI) |
MdM | Meta-data Management |
MS | Mission Support |
MSC | Mission Support Council |
MSD | Mission Support Directorate |
MSFC | Marshall Space Flight Center |
N/A | Not Applicable |
NAGPRA | Native American Graves Protection and Repatriation Act |
NAIS | NASA Acquisition Internet Service |
NASA | National Aeronautics and Space Administration |
NAVFAC | Naval Facilities |
NC | New Construction |
NCS | National CAD Standard |
NEHRP | National Earthquake Hazard Reduction Program |
NEPA | National Environmental Policy Act |
NF | NASA Form |
NFPA | National Fire Protection Association |
NFS | NASA FAR Supplement |
NHPA | National Historic Preservation Act |
NIBS | National Institute of Building Services |
NID | NASA Interim Directive |
NIPR | NASA-Interagency Purchase Request |
NIST | National Institute of Standards and Technology |
NODIS | NASA Online Directives Information System |
NOJMO | NASA Office of JPL Management and Oversight |
NPD | NASA Policy Directive |
NPG | NASA Procedures and Guidelines |
NPR | NASA Procedural Requirement |
NRC | National Research Council |
NSBF | National Scientific Balloon Facility |
NSPE | National Society of Professional Engineers |
NSS | NASA Safety Standard |
NTP | Notice to Proceed |
OA | Office of the Administrator |
OCFO | Office of the Chief Financial Officer |
OMB | Office of Management and Budget |
OMC | Operations Management Council (being replaced with the MSC) |
OMFIT | Operations and Maintenance Facilities Innovations Committee |
OP | Operating Plan |
OPC | Operating Plan Change |
OSHA | Occupational Safety and Health Administration |
OSI | Office of Strategic Infrastructure |
P&ID | Piping and Instrumentation Diagram |
PA | Programmatic Agreement |
PA&E | Office of Program Analysis and Evaluation |
PAM | Partnership Agreement Maker |
PCSD | President's Council on Sustainable Development |
PD | Program Direct |
PDRI | Project Definition Rating Index |
PER | Preliminary Engineering Report |
PES | Preliminary Environmental Survey |
PGM | Programmed Maintenance |
PMC | Program Management Council |
PM | Preventive Maintenance |
PMP | Project Management Plan |
PP&E | Property, Plant and Equipment |
PPBE | Programming, Planning, Budgeting and Execution |
PPBES | Programming, Planning, Budgeting and Execution System |
PR | Procurement Request |
PRG | Program Resource Guidance |
PT&I | Predictive Testing and Inspection |
PY | Program Year |
QA | Quality Assurance |
R&D | Research and Development |
RAC | Risk Assessment Code (Used by Safety and Health) |
RbyIR | Renewal by Incremental Repair |
RCB&EA | Reliability Centered Building and Equipment Acceptance |
RCM | Reliability- Centered Maintenance |
RCRA | Resource Conservation and Recovery Act |
RECO | Real Estate Contracting Officer |
REV | Review or Revision |
RFI | Request for Information |
RFP | Request for Proposal |
RFQ | Request for Quote |
RG | Resource Guidance |
ROD | Record of Decision |
ROI | Repair of Obsolete Items |
RPAO | Real Property Accountable Officer |
RPMP | Real Property Management Plan |
RPMS | Real Property Management System |
SAP | NASA's Core Financial System (Software Package) |
SBIC | Sustainable Buildings Industry Council |
SBPD | Summary Brief Project Document |
SCAP | Strategic Capabilities Asset Program |
SEMP | Systems Engineering Management Plan |
SF | Standard Form or Subcontractor-Furnished or Square Feet |
SHPO | State Historic Preservation Office |
SIES | Supervision, Inspection, and Engineering Services |
SII | Strategic Investment Initiative |
SMACNA | Sheet Metal and Air Conditioning National Association |
SMC | Strategic Management Council |
SME | Subject Matter Expert |
SOW | Statement of Work |
SpecsIntact | Specifications-Kept-Intact |
SPG | Strategic Planning Guidance |
SR | Service Request |
SS | Special Studies |
SSA | Source Selection Authority |
SSC | Stennis Space Center |
STE | Special Test Equipment |
SUB | Subcontractor |
TAB | Testing, Adjusting, and Balance |
TBCx | Total Building Commissioning |
TC | Trouble Call |
TCRPMD | Technical Capabilities and Real Property Management Division |
TM | Technical Manual |
UCS | Utilities Control System |
UESC | Utility Energy Service Contract |
UPN | Unique Project Number |
USACE | United States Army Corp of Engineers |
U.S.C. | United States Code |
USDA | U. S. Department of Agriculture |
USGBC | U. S. Green Building Council |
VA | Value Assessment |
VE | Value Engineering |
VM | Value Management (incorporates Value Engineering and Value Assessment) |
WBDG | Whole Building Design Guide |
WBS | Work Breakdown Structure (or Work Breakdown Structure number) |
WFF | Wallops Flight Facility (Component Facility, GSFC) |
WSTF | White Sands Test Facility (Component Facility, JSC) |
YR | Year |