| NODIS Library | Procurement, Small Business and Industrial Relations(5000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 5200.1E
Effective Date: August 13, 2019
Expiration Date: August 13, 2024
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES

Subject: Industrial Labor Relations

Responsible Office: Office of Procurement


View all pages in PDF

Table of Contents

Preface

P.1 Purpose
P.2 Application
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation

Chapter 1. Introduction

1.1 Scope
1.2 Policy
1.3 Applicability

Chapter 2. Operating Procedures for Nonconstruction Contractors

2.1 Data Requirements
2.2 Labor Contract Negotiations
2.3 Requirements for a Potential Impasse or Strike Action
2.4 Strike Notice

Chapter 3. Requirements for Construction Contractor Labor-Management Disputes

3.1 General
3.2 Data Requirements
3.3 Construction Labor Contract Negotiations
3.4 Procedures for Construction Labor Disputes Outside of Labor Contract Negotiations

Chapter 4. "Reserve Gate" Procedures

4.1 General
4.2 Establishing and Enforcing the Use of "Reserve Gates"
4.3 Procedures for Initiating Legal Action Through the National Labor Relations Board

Chapter 5. Procedure for Requesting the Removal of NASA Parts/Materials From Manufacturers' Strike-Bound Plants

5.1 General
5.2 Data Requirements

Chapter 6. Preparation for Variance Hearings Conducted Pursuant to Service Contract Labor Standards, 48 CFR Subpts. 22.10, as Amended

6.1 General

Chapter 7. Procedure for Providing Admission of Labor Union Representatives to NASA Centers

7.1 General
7.2 Procedures for Providing Access Passes to the NASA Center for Labor Union Representatives

Appendix A. Definitions
Appendix B. Acronyms

Appendix C. Checklist for Potential Impasse and Strike Action

C.1 Checklist for Potential Impasse and Strike Action
C.2 Checklist Upon Receiving Strike Notice

Appendix D. Notification of "Reserve Gate" Procedures

D.1 NASA Letter to the Labor Union on Designated "Reserve Gates"
D.2 NASA Letter to the Struck Contractor on Designated "Reserve Gate"

Appendix E. "Neutral Gate" and "Reserve Gate" Signs

E.1 Example of "Neutral Gate" Signs
E.2 Example of "Reserve Gate" Signs

Appendix F. References


DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.