P.1 Purpose
P.2 Application
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
1.1 Scope
1.2 Policy
1.3 Applicability
2.1 Data Requirements
2.2 Labor Contract Negotiations
2.3 Requirements for a Potential Impasse or Strike Action
2.4 Strike Notice
3.1 General
3.2 Data Requirements
3.3 Construction Labor Contract Negotiations
3.4 Procedures for Construction Labor Disputes Outside of Labor Contract Negotiations
4.1 General
4.2 Establishing and Enforcing the Use of "Reserve Gates"
4.3 Procedures for Initiating Legal Action Through the National Labor Relations Board
5.1 General
5.2 Data Requirements
7.1 General
7.2 Procedures for Providing Access Passes to the NASA Center for Labor Union Representatives
C.1 Checklist for Potential Impasse and Strike Action
C.2 Checklist Upon Receiving Strike Notice
D.1 NASA Letter to the Labor Union on Designated "Reserve Gates"
D.2 NASA Letter to the Struck Contractor on Designated "Reserve Gate"
E.1 Example of "Neutral Gate" Signs
E.2 Example of "Reserve Gate" Signs
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.