![]() |
NASA Procedural Requirements |
NPR 8705.6D Effective Date: March 29, 2019 Expiration Date: April 30, 2025 |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | AppendixA | AppendixB | AppendixC | AppendixD | ALL | |
Requirements Document |
IFOSA |
QAAR |
Interim/ Independent Assessment |
NPD 8020.7, Biological Contamination Control for Outbound and Inbound Planetary Spacecraft | |||
NPD 8700.1, NASA Policy for Safety and Mission Success |
X |
X |
X |
NPR 4100, NASA Materials Inventory Management Manual |
X |
X |
|
NPR 7150.2,NASA Software Engineering Requirements |
X |
X |
|
NPR 7900.3, Aircraft Operations Management |
(Currently audited by the Intercenter Aircraft Operations Panel) |
||
NPR 8000.4, Agency Risk Management Procedural Requirements |
X |
||
NPR 8621.1, NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping |
X (Including the Center and resident programs and projects) |
X |
|
NPR 8705.2, Human-Rating Requirements for Space System |
X |
X |
|
NPR 8705.4, Risk Classifications for NASA Payloads |
X |
X |
|
NPR 8705.5, Technical Probabilistic Risk Assessment (PRA) Procedures for Safety and Mission Success for NASA Programs and Projects |
X |
||
NPR 8705.6, Safety and Mission Assurance Audits, Reviews, and Assessments |
X |
X |
X |
NPR 8715.1, NASA Safety and Health Programs |
X |
X |
|
NPR 8715.3, NASA General Safety Program Requirements |
X |
X |
|
NPR 8715.5, Range Flight Safety Program |
X (Non-Unmanned Aircraft Systems range operations, including space launch/ entry and scientific balloon operations) |
X |
|
NPR 8715.6, NASA Procedural Requirements for Limiting Orbital Debris |
X |
||
NPR 8715.7, Payload Safety Program |
X |
||
NPR 8735.1, Exchange of Problem Data Using NASA Advisories and the Government-Industry Data Exchange Program (GIDEP) |
X (Including Center operations and programs and projects) |
X |
|
NPR 8735.2, Hardware Quality Assurance Program Requirements for Programs and Projects |
X |
X |
|
NASA-STD-6016, Standard Materials and Processes for Spacecraft | X | X | |
NASA-STD-8709.20, Management of Safety and Mission Assurance Technical Authority (SMA TA) Requirements (As required by NPR 8715.3) |
X |
X |
|
NASA STD-8719.9, Standard for Lifting Devices and Equipment (As required by NPR 8715.3) |
X |
X |
|
NASA-STD-8719.11, Standard for Fire Protection and Life Safety (as required by NPR 8715.3) |
X |
X |
|
NASA-STD-8719.12, Safety Standard for Explosives, Propellants, and Pyrotechnics (As required by NPR 8715.3) |
X |
X |
|
NASA-STD-8719.13, Software Safety Standard (As required by NPR 7150.2) |
X |
X |
|
NASA-STD 8719.14, Process for Limiting Orbital Debris (As required by NPR 8715.6) |
X |
||
NASA-STD-8719.17, NASA Requirements for Ground-Based Pressure Vessels and Pressurized Systems (PVS) |
X |
X |
|
NASA-STD-8729.1, NASA Reliability and Maintainability (R&M) Standard for Spaceflight and Support System | X | ||
NASA-STD-8739.1, Workmanship Standard for Polymeric Application on Electronic Assemblies |
X |
X |
|
NASA-STD-8739.2, Workmanship Standard for Surface Mount Technology (applicable to the extent noted in NASA-STD-8739.6) |
X |
X |
|
NASA-STD-8739.3, Electrical Connections (applicable to the extent noted in NASA-STD-8739.6) |
X |
X |
|
NASA-STD-8739.4, Workmanship Standard for Crimping, Interconnecting Cables, Harnesses, and Wiring (as required by NPD 8730.5) |
X |
X |
|
NASA-STD-8739.5, Workmanship Standard for Fiber Optics Terminations, Cable Assemblies, and Installation |
X |
X |
|
NASA-STD-8739.6, Implementation Requirements for NASA Workmanship Standards (as required by NPD 8730.5) |
X |
X |
|
NASA-STD-8739.8, Software Assurance and Software Safety Standard (as required by NPR 7150.2) |
X |
X |
|
NASA-STD-8739.10, Baseline, Electrical, Electronic, and Electromechanical (EEE) Parts Assurance Standard | X | X | |
NASA-STD-8739.12, Metrology & Calibration | X | X | |
NASA-STD-8739.14, NASA Fastener Procurement, Receiving Inspection, and Storage Practices for NASA Mission Hardware
|
X | X |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | AppendixA | AppendixB | AppendixC | AppendixD | ALL | |
| NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.