NASA Procedural Requirements |
NPR 8715.24 Effective Date: September 24, 2021 Expiration Date: September 24, 2026 |
| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | AppendixD | ALL | |
CDR | Critical Design Review |
CERR | Critical Event Readiness Reviews |
COSPAR | Committee on Space Research |
EOM | End of Mission |
FFRDC | Federally Funded Research and Development Center |
JPL | Jet Propulsion Laboratory |
KDP | Key Decision Point |
LCR | Life-Cycle Review |
MCR | Mission Concept Review |
MDAA | Mission Directorate Associate Administrator |
MDR | Mission Definition Review |
OPP | Office of Planetary Protection |
OSMA | Office of Safety and Mission Assurance |
PDR | Preliminary Design Review |
PLAR | Post-Launch Assessment Review |
PPO | Planetary Protection Officer |
PSR | Permanently Shadowed Region |
SMA | Safety and Mission Assurance |
SMSR | Safety and Mission Success Review |
SRR | System Requirements Review |
TA | Technical Authority |
| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | AppendixD | ALL | |
| NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.