NASA Procedural Requirements |
NPR 8705.6D Effective Date: March 29, 2019 Expiration Date: December 29, 2024 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
1.1 Introduction
1.2 Objectives
2.1 Overview
2.2 Roles and Responsibilities
2.3 SMA Audit, Review, and Assessment Requirements
2.4 Pre-Audit Discovery
2.5 Institutional, Facility, Operational Safety Audits (IFOSA)
2.6 Quality Audit, Assessment, and Review (QAAR)
2.7 Interim Center Assessment (ICA)
3.1 Overview
3.2 Roles and Responsibilities
3.3 SMSR Process
4.1 Overview
4.2 Roles and Responsibilities
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.