[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8820.2E
Eff. Date: October 07, 2003
Cancellation Date: January 28, 2008

Facility Project Implementation Guide

| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | image022 | image023 | Image3-1 | Image_G-1 | ALL |


APPENDIX B: Abbreviations and Acronyms

A.
ADA Americans with Disabilities Act
A-E Architect-Engineer
AFPCE Approved Facility Project Cost Estimate
ARC Ames Research Center
ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers
ASTM American Society for Testing Materials
B.
BCA Building Commissioning Association
BEES Building for Environmental and Economic Sustainability
BIPV Building-Integrated Photovoltaics
BMP Best Management Practices
BTU British Thermal Units
BY Budget Year
C.
CA Commissioning Authority
CCB Change Control Board
CCE Current Cost Estimate
CFO Chief Financial Officer
CFR Code of Federal Regulations
CII Construction Industry Institute
CMMS Computerized Maintenance Management System
CO Change Order or Contracting Officer
CoF Construction of Facilities
COSS Center Operations Support Services
COTR Contracting Officer Technical Representative
CPG Comprehensive Procurement Guidelines
CPM Critical Path Method
CSI Construction Specification Institute
D.
DF Downey Facility
DOD Department of Defense
DOE Department of Energy
DSN Deep Space Network
E.
EA Environmental Assessment
EE Engineering Estimate
EEO Equal Employment Opportunity
EIS Environmental Impact Statement
EMCS Energy Management Control Systems
EO Executive Order
EPA Environmental Protection Agency
F.
FAR Federal Acquisition Regulations
FEMP Federal Energy Management Program
FMEA Failure Modes and Effects Analysis
FMM Financial Management Manual
FMP Facilities Master Plan
FMS Facilities Management System
FO Functional Offices
FONSI Finding Of No Significant Impact
FP&D Facility Planning and Design
FPDS Facility Project Data System
FPIG Facility Project Implementation Guide
FPM Facility Project Manager
FPMS Facility Project Management System
FPN Facility Project Number
FPT Functional Performance Test
FPT Functional Performance Tests
FRB Facilities Review Board
FSC Federal Supply Catalog
FY Fiscal Year
G.
GBA Green Building Advisor
GFP Government Furnished Property
GPE Goverment Furnished Property
GRC Glenn Research Center
GSA General Services Administration
GSE Ground Support Equipment
GSFC Goddard Space Flight Center
H.
HSF Human Space Flight
HVAC Heating, Ventilation, and Air-Conditioning
I.
IAQ Indoor Air Quality
IEQ Indoor Environmental Quality
IESNA Illuminating Engineering Society of North America
IFB Invitation for Bid
IPO Institutional Program Offices
ISC Interagency Security Committee
IST Integrated Systems Test
J.
JPL Jet Propulsion Laboratory
JSC Johnson Space Center
K.
KSC Kennedy Space Center
L.
LaRC Langley Research Center
LEED Leadership in Energy and Environmental Design
LLIS Lessons Learned Information System
LOGO Limitation of Government Obligation
LS Lump Sum
M.
MAF Michoud Assembly Facility
MS Mission Support
MSFC Marshall Space Flight Center
N.
N/A Not Applicable
NASA National Aeronautics and Space Administration
NEHRP National Earthquake Hazard Reduction Program
NEPA National Environmental Policy Act
NFPA National Fire Protection Association
NFS NASA Far Supplement
NIBS National Institute of Building Services
NIST National Institute of Standards and Technology
NODIS NASA Online Directives Information Systems
NPD NASA Policy Directive
NPG NASA Procedures and Guidelines
NRC National Research Council
NSBF National Scientific Balloon Facility
NSPE National Society of Professional Engineers
NSS NASA Safety Standard
NTP Notice to Proceed
O.
O&M Operations and Maintenance
OMB Office of Management and Budget
OPR Owner's Project Requirements
OSHA Occupational Safety and Health Administration
P.
P3 Preproject Planning
PAR Preadvertisement Review
PBS Plum Brook Station
PCSD President's Council on Sustainable Development
PD Program Direct
PDRI Project Definition Rating Index
PER Preliminary Engineering Report
PES Preliminary Environmental Survey
POP Program Operating Plan
PR Procurement Request
PT&I Predictive Testing & Inspection
Q.
QA Quality Assurance
R.
R&D Research and Development
RCB&E Reliability Centered Building and Equipment
RCBEA Reliability Centered Building and Equipment Acceptance
RCM Reliability Centered Maintenance
RCRA Resource Conservation and Recovery Act
REV Review
RF Radio Frequency
RFP Request For Proposal
RFQ Request For Quote
ROD Record of Decision
S.
SAT Science, Aeronautics, and Technology
SBIC Sustainable Buildings Industry Council
SF Subcontractor Furnished or Standard Form
SIES Supervision, Inspection, and Engineering Services
SOW Statement Of Work
SPECSINTACTSpecifications-kept-Intact
SPOC Single Point-Of-Contact
SSA Source Selection Authority
SUB Subcontractor
T.
TAB Testing, Adjusting, and Balance
TM Technical Manual
U.
UCS Utilities Control System
UPN Unique Project Number
USGBC U.S. Green Building Council
V.
VE Value Engineering
W.
WBDG Whole Building Design Guide
WFF Wallops Flight Facility
WSTF White Sands Test Facility
Y.
YR Year


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | image022 | image023 | Image3-1 | Image_G-1 | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov