[NASA Logo]

NASA Procedures and Guidelines

This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov


NPR 8820.2G
Eff. Date: June 05, 2014
Cancellation Date:

Facility Project Requirements (FPR)

| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL |


Appendix B. Acronyms

A-E Architect-Engineer
AFPCE Approved Facility Project Cost Estimate
AHJ Authority Having Jurisdiction
ARC Ames Research Center
ARFR Adaptive Reuse Feasibility Report
ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers
ASTM American Society for Testing Materials
BCA Building Commissioning Association
BIM Building Information Modeling
BMP Best Management Practices
BTU British Thermal Units
BY Budget Year
CA Commissioning Authority
CCB Change Control Board
CCE Current Cost Estimate
CFO Chief Financial Officer
C.F.R. Code of Federal Regulations
CII Construction Industry Institute
CMMS Computerized Maintenance Management System
CMP Center Master Plan
CO Contracting Officer
CoF Construction of Facilities
COSS Center Operations Support Services
COR Contracting Officer's Representative
CPG Comprehensive Procurement Guidelines
CPM Critical Path Method
CSI Construction Specification Institute
DBT Design-Basis Threat
DFRC Dryden Flight Research Center
DoD Department of Defense
DOE Department of Energy
DSN Deep Space Network
EA Environmental Assessment
EE Engineering Estimate
EEO Equal Employment Opportunity
EIS Environmental Impact Statement
EMCS Energy Management Control Systems
Exec. Order Executive Order
EPA Environmental Protection Agency
ESPC Energy Savings Performance Contract
EUL Enhanced Use Lease
EVM Earned Value Management
FAR Federal Acquisition Regulation
FEMP Federal Energy Management Program
FED Facilities Engineering Division
FHPSB Federal High Performance and Sustainable Buildings
FMEA Failure Modes and Effects Analysis
FMM Financial Management Manual
FMS Facilities Management System
FONSI Finding of No Significant Impact
FP&D Facility Planning and Design
FPM Facility Project Manager
FPN Facility Project Number
FPT Functional Performance Tests
FRB Facilities Review Board
FSC Federal Supply Catalog
FY Fiscal Year
GAO Government Accountability Office
GBA Green Building Advisor
GFP Government-Furnished Property
GPE Government-wide Point of Entry
GRC Glenn Research Center
GSA General Services Administration
GSE Ground Support Equipment
GSFC Goddard Space Flight Center
HABS Historic American Building Survey
HAER Historic American Engineering Record
HPO Historic Preservation Officer
HSF Human Space Flight
HVAC Heating, Ventilation, and Air-Conditioning
IAQ Indoor Air Quality
IEQ Indoor Environmental Quality
IESNA Illuminating Engineering Society of North America
IFB Invitation for Bid
IPO Institutional Program Offices
ISC Interagency Security Committee
IST Integrated Systems Test
JPL Jet Propulsion Laboratory, a Federally Funded Research and Development
Center
JSC Johnson Space Center
KSC Kennedy Space Center
LaRC Langley Research Center
LEED Leadership in Energy and Environmental Design
LLIS Lessons Learned Information System
LS Lump Sum
MAF Michoud Assembly Facility
MS Mission Support
MSFC Marshall Space Flight Center
N/A Not Applicable
NASA National Aeronautics and Space Administration
NEHRP National Earthquake Hazard Reduction Program
NEPA National Environmental Policy Act
NFPA National Fire Protection Association
NFS NASA Far Supplement
NHPA National Historic Preservation Act
NIBS National Institute of Building Services
NIST National Institute of Standards and Technology
NODIS NASA Online Directives Information System
NPD NASA Policy Directive
NPR NASA Procedural Requirements
NRC National Research Council
NSBF National Scientific Balloon Facility
NSPE National Society of Professional Engineers
NSS NASA Safety Standard
NTP Notice to Proceed
O&M Operations and Maintenance
OMB Office of Management and Budget
OPR Owner's Project Requirements
OSHA Occupational Safety and Health Administration
PBS Plum Brook Station
PCSD President's Council on Sustainable Development
PD Program Direct
PDRI Project Definition Rating Index
PER Preliminary Engineering Report
PES Preliminary Environmental Survey
PPBES Planning, Programming, Budgeting and Execution System
PR Procurement Request
PT&I Predictive Testing & Inspection
QA Quality Assurance
R&D Research and Development
RCBEA Reliability Centered Building and Equipment Acceptance
RCM Reliability Centered Maintenance
RCRA Resource Conservation and Recovery Act
REV Review
RFP Request for Proposal
RFQ Request for Quote
ROD Record of Decision
RPAO Real Property Accountable Officer
SAAM Space Act Agreement Maker
SBIC Sustainable Buildings Industry Council
SF Standard Form or Subcontractor-Furnished
SHPO State Historic Preservation Officer
SIES Supervision, Inspection, and Engineering Services
SOW Statement of Work
SPECSINTACT Specifications-Kept-Intact
SPOC Single Point-of-Contact
SS Special Studies
SSA Source Selection Authority
SSC Stennis Space Center
SUB Subcontractor
TAB Testing, Adjusting, and Balance
TM Technical Manual
UCS Utilities Control System
UESC Utility Energy Services Contract
UFGS Unified Facilities Guide Specifications
UPN Unique Project Number
USGBC U.S. Green Building Council
VE Value Engineering
WBDG Whole Building Design Guide
WBS Work Breakdown Structure
WFF Wallops Flight Facility
WSTF White Sands Test Facility
YR Year


| TOC | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This Document is Obsolete and Is No Longer Used.
Check the NODIS Library to access the current version:
http://nodis3.gsfc.nasa.gov