| NODIS Library | Program Formulation(7000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 7120.7A
Effective Date: August 17, 2020
Expiration Date: August 17, 2030
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES
Printable Format (PDF)

Subject: NASA Information Technology Program and Project Management Requirements (Revalidated with Change 1)

Responsible Office: Office of the Chief Information Officer


| TOC | ChangeLog | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | AppendixD | AppenidxE | ALL |

Appendix D. IT Service Line and Project Gate Products

Key: P=Preliminary, F=Final, U=Updated

D.1 IT Service Line Gate Products

Table D-1. IT Service Line Gate Products

D.2 Pre-Formulation into Formulation Gate Products

Table D-2. Pre-Formulation

D.3 IT Project Gate Products

Table D-3. IT Project Gate Products

1If Pre-Formulation includes TD refer to TD Gate products matrix - requirements listed for Pre-Formulation must still be addressed in the Compliance Matrix.
2Deployment is completed during the Deployment / O&M Phase and the results presented at PCR.

| TOC | ChangeLog | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | AppendixA | AppendixB | AppendixC | AppendixD | AppenidxE | ALL |
 
| NODIS Library | Program Formulation(7000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.