NASA Procedural Requirements |
NPR 8705.2C Effective Date: July 10, 2017 Expiration Date: July 10, 2024 |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL | |
CDR | Critical Design Review |
EVA | Extravehicular Activity |
FAA | Federal Aviation Administration |
HEA | Human-Error Analysis |
HQR | Handling Qualities Rating |
HRCP | Human-Rating Certification Package |
ISS | International Space Station |
JSC | Johnson Space Center |
NPD | NASA Policy Directive |
NPR | NASA Procedural Requirements |
ORR | Operational Readiness Review |
PDR | Preliminary Design Review |
PRA | Probabilistic Risk Assessment |
SDR | System Definition Review |
SIR | System Integration Review |
SRR | Systems Requirements Review |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL | |
| NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.