|
NASA Procedural Requirements |
NPR 8705.2C Effective Date: July 10, 2017 Expiration Date: December 16, 2026 |
| | TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL | |
| CDR | Critical Design Review |
| EVA | Extravehicular Activity |
| FAA | Federal Aviation Administration |
| HEA | Human-Error Analysis |
| HQR | Handling Qualities Rating |
| HRCP | Human-Rating Certification Package |
| ISS | International Space Station |
| JSC | Johnson Space Center |
| NPD | NASA Policy Directive |
| NPR | NASA Procedural Requirements |
| ORR | Operational Readiness Review |
| PDR | Preliminary Design Review |
| PRA | Probabilistic Risk Assessment |
| SDR | System Definition Review |
| SIR | System Integration Review |
| SRR | Systems Requirements Review |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | ALL | |
| | NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.