NASA Procedural Requirements |
NPR 8715.7B Effective Date: April 27, 2020 Expiration Date: April 27, 2025 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents and Forms
P.5 Measurement/Verification
P.6 Cancellation
2.1 Chief, Safety and Mission Assurance
2.2 Center Director
2.3 Mission Directorate Associate Administrator (for the payload)
2.4 Payload Project Manager
3.1 The Payload Safety Review and Approval Process
3.2 Establishing the Payload Safety Working Group
3.3 Payload Safety Process and Standard Determination
3.4 Payload Safety Reviews, Implementation, and Processes
3.5 Waiver Process
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.