| NODIS Library | Program Management(8000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 8715.7B
Effective Date: April 27, 2020
Expiration Date: April 27, 2030
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES
Printable Format (PDF)

Subject: Payload Safety Program

Responsible Office: Office of Safety and Mission Assurance


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | ALL |

Appendix B. Acronyms

CDR Critical Design Review
GSE Ground Support Equipment
JPL Jet Propulsion Laboratory
LSP Launch Services Program
MDAA Mission Directorate Associate Administrator
NASA Forms NASA Forms
NPD NASA Policy Directive
NPR NASA Procedural Requirements
PDR Preliminary Design Review
Pre-ship Review Prior to Shipment to Launch Site
PSWG Payload Safety Working Group
SBU Sensitive but Unclassified
SMA Safety and Mission Assurance
STD Standard
SVTL Safety Verification Tracking Log
TA Technical Authority


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.