|
NASA Procedural Requirements |
NPR 8715.7B Effective Date: April 27, 2020 Expiration Date: April 27, 2030 |
| | TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | ALL | |
|
|
|
|
|
1 |
03/04/2021 |
Moved the citation of NPR 8715.1 from Appendix C. Reference Documents to P.4 Applicable Documents. NPR 8715.1 replaced NPR 8715.3 as the governing directive in section 3.5 for the request for relief process to requirements in this NPR. |
|
2 |
05/01/2025 |
Revalidated for another 5 years with the following administrative updates made:
- Added NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and references to unmanned orbital and unmanned deep space payloads that fly on launch vehicles to uncrewed to the applicability section. - Added Ground Support Equipment (GSE) to Table 3-1 to clarify payload includes GSE. - Corrected nomenclature for NASA-STD-8719.24, NASA Expendable Launch Vehicle Payload Safety Requirements. - Removed Center Director's responsibility for alternative payload safety processes. - Removed Deviation definition from Appendix A. - Updated the overall format for the directive to comply with requirements for content and structure of directives. |
| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppendixA | AppendixB | AppendixC | ALL | |
| | NODIS Library | Program Management(8000s) | Search | |
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.