NASA Procedural Requirements |
NPR 2570.1C Effective Date: September 22, 2014 Expiration Date: September 22, 2026 |
P.1 Purpose
P.2 Applicability
P.3 Authority
P.4 Applicable Documents
P.5 Measurement/Verification and Forms
P.6 Cancellation
1.1 Purpose
1.2 Spectrum Management Policy Guidance
1.3 Regulatory Structure
1.4 NASA Spectrum Management Program Overview
2.1 Agency-Level Responsibilities
2.2 NASA Mission Directorates and Other Headquarters Offices Responsibilities
2.3 NASA Centers Responsibilities
2.4 Mission/Program/Project Responsibilities
2.5 Host Responsibilities
3.1 General
3.2 Frequency Allocations
3.3 Frequency Assignments
3.4 U.S. Coordination Requirements
3.5 NASA Contractors and Grantees
3.6 Foreign Frequency Assignments
3.7 Conditions of Assignment
3.8 Emergency and Wartime Procedures
4.1 Radio Frequency Interference (RFI) Reporting Procedures
4.2 RFI Control Procedures
5.1 Background
5.2 Long-Range Planning
This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.