NASA Procedures and Guidelines |
|
This Document is Obsolete and Is No Longer Used.
|
Preface
P.1 Purpose
P.2 Applicability and Scope
P.3 Authority
P.4 References
Appendix H. Templates
H-1 Sample SE NPR Implementation Plan Template
H-2 SE NPR Center Survey
Appendix I. Additional Reading
Figure 1-1 - SE Framework
Figure 2-1 - Implementation Architecture
Figure 3-1 - SE Engine
Figure 3-2 - Application of SE Engine Processes within System Structure
Figure 5-1 - Product Line Life Cycle
Figure A-1 - Product-Based WBS Model Example
Figure C-1 - Stakeholder Expectation Definition Process
Figure C-2 - Technical Requirements Definition Process
Figure C-3 - Logical Decomposition Process
Figure C-4 - Design Solution Definition Process
Figure C-5a - Product Implementation Process
Figure C-5b -Sequencing of Design Realization Processes
Figure C-6 - Product Integration Process
Figure C-7 - Product Verification Process
Figure C-8 - Product Validation Process
Figure C-9 - Product Transition Process
Figure C-10 - Technical Planning Process
Figure C-11 - Requirements Management Process
Figure C-12 - Interface Management Process
Figure C-13 - Technical Risk Management Process
Figure C-14 - Configuration Management Process
Figure C-15 - Technical Data Management Process
Figure C-16 - Technical Assessment Process
Figure C-17 - Decision Analysis Process
Table G-1 - MCR Entrance and Success Criteria
Table G-2 - SRR/MDR Entrance and Success Criteria
Table G-3 - SDR Entrance and Success Criteria
Table G-4 - PDR Entrance and Success Criteria
Table G-5 - CDR Entrance and Success Criteria
Table G-6 - TRR Entrance and Success Criteria
Table G-7 - SAR Entrance and Success Criteria
Table G-8 - FRR Entrance and Success Criteria
Table G-9 - ORR Entrance and Success Criteria
Table G-10 - DR Entrance and Success Criteria