NASA Procedures and Guidelines |
|||||
This Document is Obsolete and Is No Longer Used.
|
|||||
|
|||||
|
|
||||
| TOC | Change History | Preface | Prologue | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | AppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | ALL | |
Activity(ies), iii, 2, 5, 7, 14, 15, 21, 25, 29, 31, 34, 35, 41, 44, 49, 53, 55, 57, 60, 62, 64, 65, 68, 69, 71, 72, 73, 75, 76, 77, 79, 81, 86, 92, 93, 94, 96, 97, 98, 99, 100
Advanced Technology Development, 1, 30
Analysis of Alternative, 92
Applied Research, 23, 30, 38
Approval, 5, 38, 39
Architecture, iii, iv, 93, 95
Assessment(s), 11, 19, 20, 21, 40, 44, 57, 58, 60, 61, 65, 67, 69, 80, 81, 92, 93, 94, 95, 96, 98
ATD, 1, 30
Authority, iii, 5, 9, 11, 21, 30, 86
BAR, 1
Baseline, 15, 18, 31, 36, 85, 93, 94, 95, 96, 100
Basic and Applied Research, 1
Basic and Applied Research (BAR), 1
Budget, 96
CDR, iv, v, 96
Center Director(s), 9, 10, 11, 15, 16, 17, 18, 19, 20, 88
Common Technical Processes, iii, 7, 13, 14, 15, 21, 23, 40, 64, 86
Configuration Management, iv, 19, 76, 91, 97
Constraint(s), 4, 13, 31, 34, 90, 93, 94, 95, 96, 99, 100
Contractor, 8, 21, 30, 34, 86
Control(s), 10, 21, 27, 38, 64, 69, 70, 74, 93, 95
Criteria
Entrance, 92, 93, 94, 95, 96, 97, 98, 99, 100
Exit, 13, 18, 31, 33, 84, 86
Critical Design Review, iv, v, 96
Customer, 1, 18, 22, 30, 31, 32, 33, 34, 35
Decision Analysis, v, 20, 21, 82
Decommissioning Review, iv, v, 38, 100
Definition
Design Solutions, iv, 16, 17, 41, 42, 45, 46, 47, 48, 49, 50, 51, 52, 57, 58, 59, 63, 66, 70, 86
Stakeholder Expectations, 15, 18
Technical Requirements, iv, 16, 17, 45
Technical Solutions, 21
Design Realization, iv, 21
Disposal, 4, 5, 14, 22, 95, 96
Document(s), iii, iv, 1, 2, 18, 38, 40, 69, 70, 71, 84, 93, 94, 96, 97, 99
Interface Control, 38, 95, 96
Domain, 35
DR, iv, v, 38, 100
Electromagnetic Interference, 95
EMI, 95
Enabling Products, 14, 16, 19, 34, 85, 99
Engineering, 1, 2, 4, 7, 9, 10, 15, 20, 26, 28, 34, 35, 38, 39, 66, 83, 87, 91, 92, 95, 96, 101, 103
Entrance Criteria, 92, 93, 94, 95, 96, 97, 98, 99, 100
Environment(al,s), 1, 2, 34, 35, 38, 95, 97, 98, 99
Exit Criteria, 13, 18, 31, 33, 84, 86
Formulation, 38
Governing Authority, iii, 2, 5, 38, 84
Implementation, iii, iv, 1, 2, 10, 28, 31, 86, 88, 102
Institutional Project, 1
Integrate(d,s), 38, 96
Integration, iv, 95
Interface Control Document, 95, 96
Interface(s)
Technical, 95
IP, 1
Key Performance Parameter, 30, 35
KPP, 30
Life Cycle, iii, iv, 20, 92, 103
Life Cycle Processes, 103
Logical Decomposition, iv, 16, 46, 47
Management
Configuration, iv, 19, 76, 91, 97
Project, 5, 9, 93
Risk, iv, 19, 72, 73, 92
Systems engineering, 1, 5
Systems Engineering, iii, 93, 94
Management Life Cycle(s), 2, 23, 31
MCR, iv, v, 92, 93
Measure of Effectiveness, 17, 18, 30, 92
Measure of Performance, 17, 30, 35, 43, 44, 46, 92
Milestone, 98
Mission, iv, 1, 2, 9, 14, 21, 31, 32, 34, 35, 38, 39, 45, 62, 63, 92, 93, 94, 95, 96, 99
Mission Assurance, 2, 39, 93, 94, 95, 96
Mission Concept Review, iv, v, 92, 93
Mission Directorate, 9, 38
Mission Support Office, 38
MoE, 17, 30
MOP(s), 17, 30, 32, 35, 92
NASA Policy Directive, 2, 5, 9
NASA Procedural Document, 2, 4, 5, 9
NASA Procedural Requirements, iv, 1, 2, 5, 7, 8, 9, 10, 11, 13, 15, 20, 23, 30, 31, 35, 39, 40, 102
Non-Advocate Review, 39, 92, 93
NPD, 2, 5, 9
NPR, iv, 1, 2, 5, 7, 8, 9, 10, 11, 13, 15, 20, 23, 30, 31, 35, 39, 40, 102
OCE, 7, 9, 10, 40
Office of the Chief Engineer, ii, 7, 9, 10, 40
Operational Concepts, 93
Operational Readiness Review, iv, v, 99
Organization, iii, 2, 5, 9, 30, 85, 86
ORR, iv, v, 99
PDR, iv, v, 75, 94, 95, 96
Peer Review, iv, 1, 38, 39, 83, 101
Periodic Technical Review, iv, 25
Phase B, 94
Phase D, 99
Phase(s)
B, 94
D, 99
Implementation, 31
Life Cycle, 2, 8, 15, 18, 23, 26, 31, 33, 84, 86
Plan(s)
EMI/EMC Control, 95
Integration, 95
Project, 39, 83, 87, 92
Project Management, 93
Quality Assurance, 95
Systems Engineering Management (SEMP), iii, 1, 5, 11, 34, 39, 93, 94
Technical, iv, 5, 18, 21, 29, 67, 92, 95
Technical Performance Measurement, 95
Validation, 95, 96
Verification, 96
PR, 1, 39, 83, 101
Preliminary Design Review, iv, v, 75, 94, 95, 96
Process(es)
Assessment, 20, 44, 57, 58, 60, 61, 65, 67, 69, 80, 81
Common Technical, iii, 7, 13, 14, 15, 21, 23, 40, 64, 86
Decision Analysis, v, 20, 82
Definition, 16, 40, 41, 42, 43, 45, 46, 48, 49, 51
Design, iii, 14, 18, 19
Design Realization, iv
Expectation Definition, 43
Life Cycle, 103
Planning, 18, 25, 49, 57, 59, 65, 67, 72, 78
Product Realization, iii, 14, 20
Product Transition, iv, 18, 64
Product Verification, iv, 17, 58
Realization, 51, 52
Stakeholder Expectation Definition, iv
Stakeholder Expectations Definition, 15, 18
Technical, 1, 4, 7, 13, 15, 18, 28, 31, 34, 40, 62, 65, 72, 77, 84, 85, 86
Technical Control, v, 20, 25, 78, 80
Technical Management, iii, 14, 20
Technical Planning, iv, 18, 67
Technical Requirements Definition, iv, 16, 17, 42, 45
Transition, 18, 52, 54, 55, 57, 59, 61, 62, 63, 64
Process(s)
Product Validation, iv, 18, 61
Processes, iii, iv, v, 1, 5, 7, 8, 9, 13, 14, 15, 16, 17, 18, 19, 20, 26, 31, 32, 33, 38, 40, 42, 43, 45, 46, 47, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 61, 62, 64, 65, 66, 67, 69, 70, 71, 72, 73, 74, 76, 77, 78, 79, 80, 81, 82, 93, 94, 95, 101, 103
Product Lines, iv, 31
Product Realization Processes, iii, 14, 20
Product(s)
Enabling, 14, 16, 19, 34, 85, 99
Program Management Committee, 27
Project(s)
Institutional, 1, 38
PTR, iv
Request for Proposal, 21
Requests for Action, 26, 93
Requirement(s)
Interface, 49, 94
Software Engineering, 2, 52
System, iv, 31, 35, 93
Requirements Management, iv, 18, 69
Requirements Review, 26, 39, 92
Research
Applied, 23, 30, 38
Basic and Applied (BAR), 1
Review, iv, 1, 5, 8, 11, 25, 26, 27, 32, 34, 38, 39, 50, 64, 73, 78, 79, 85, 90, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101
Review(s)
Confirmation (CR), 38
Continuation (CnR), 38
Continuation (ConR), 38
Critical Design (CDR), iv, v, 96
Decommissioning (DR), iv, v, 38, 100
Flight Readiness (FRR), iv, v, 38, 98, 99
Management, 26
Mission Concept (MCR), iv, v, 92, 93
Non-Advocate (NAR), 39, 92, 93
Operational Readiness (ORR), iv, v, 99
Peer, iv, 38, 101
Periodic Technical (PTR), iv, 25
Preliminary Design (PDR), iv, v, 75, 94, 95, 96
Pre-Non-Advocate (PNAR), 39
Product Definition (PDR), iv, v, 75, 94, 95, 96
Production (PR), 1, 39, 83, 101
System Acceptance (SAR), iv, v, 98
System Definition (SDR), iv, 94
System Definition or Design (SDR), iv, v, 93, 94, 95
System Requirements (SRR), iv, v, 26, 92, 93, 94
Technical, iii, iv, 8, 11, 23, 26, 34, 92, 99
Technical Progress, 26
Test Readiness (TRR), iv, v, 97
RFA, 26
RFP, 21
Risk Management, iv, 19, 72, 73, 92
Roles and Responsibilities, iii, 9, 87
Safety, 1, 2, 25, 34, 35, 39, 45, 46, 81, 87, 94, 95, 96, 97, 99, 100
SAR, iv, v, 98
Schedule, 2, 5, 13, 20, 34, 92, 93, 94, 95, 96
SDR, iv, v, 93, 94, 95
SE, iv, 1, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 23, 31, 35, 39, 40, 64, 65, 83, 84, 87, 88, 90, 91, 100, 102, 103
SEMP, iii, 1, 5, 10, 11, 15, 18, 21, 22, 28, 29, 83, 84, 86, 92, 93, 94
SEWG, 10
Shall, 9, 10, 15, 16, 21, 22, 25, 26, 29, 31, 33
Software Design Documents, 96
Software Development Plan, 39, 93
Software Test Plan, 94
SRR, iv, v, 26, 92, 93, 94
Stakeholder, iv, 13, 15, 16, 17, 18, 23, 31, 32, 35, 42
Stakeholder Expectations, iv, 13, 15, 16, 17, 18, 23, 42
System, i, iii, iv, 1, 4, 5, 6, 7, 9, 10, 14, 15, 18, 19, 20, 21, 23, 25, 26, 28, 30, 31, 33, 35, 36, 39, 41, 44, 46, 48, 49, 53, 55, 57, 60, 62, 65, 68, 69, 72, 75, 77, 79, 81, 83, 85, 87, 92, 93, 94, 95, 96, 97, 98, 99, 101, 103
System Acceptance Review, iv, v, 98
System Definition Review, iv, v, 93, 94, 95
System Design Review, iv, v, 93, 94, 95
System Engineering Management Plan, iii, 1, 5, 10, 15, 18, 21, 22, 28, 29, 40, 66, 83, 84, 86, 92, 93, 94
System Engineering Working Group, 10
System Requirements Review, iv, v, 26, 92, 93, 94
System Safety, 93
System(s) Engineering Working Group, 10
Systems Acceptance Review, 98
Systems Engineering, i, iii, iv, 1, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 21, 23, 26, 28, 31, 35, 39, 40, 64, 65, 83, 84, 87, 88, 90, 91, 93, 94, 100, 101, 102, 103
Tailoring, iv, 5, 83, 86
Technical Management Processes, iii, 14, 20
Technical Performance Measures, 30, 35, 79
Technical Performance Metrics, 30, 79, 95
Technical Requirements, iv, 5, 16, 17, 45, 94
Technical Team, 1, 5, 15, 21, 22, 26, 29, 35, 74, 93, 94, 95, 96
Test Readiness Review, iv, v, 97
TPM, 30, 79, 95
Training, 15, 32, 66, 97, 99
Transitions, 18, 21, 22, 33, 35, 52, 54, 55, 57, 59, 61, 62, 63, 64, 98
TRR, iv, v, 97
Validation, 15, 17, 49, 57, 59, 61, 62, 78, 86, 93, 95, 96, 99
Verification, 16, 17, 33, 49, 52, 55, 56, 59, 86, 93, 95, 96
Verification and Validation, 33
Waivers, 5, 83, 88, 99
WBS, iv, 14, 15, 16, 17, 18, 33, 34, 35, 37, 41, 44, 46, 49, 53, 55, 57, 60, 62, 63, 65, 68, 69, 72, 75, 77, 79, 81, 85, 87
Work Breakdown Structure, iv, 14, 15, 16, 17, 18, 33, 34, 35, 37, 41, 44, 46, 49, 53, 55, 57, 60, 62, 63, 65, 68, 69, 72, 75, 77, 79, 81, 85, 87
[1]J.A. Moody, W.L. Chapman, F.D. Van Voorhees, A.T. Bahill, Metricsßand Case Studies for Evaluating EngineeringßDesigns (Upper Saddle River, NJ: Prentice Hall, 1997).
[2]The SEMPßis an input to the common technical processesßbut it is not shown in each process diagram in this appendix.