Announcement of Opportunity |
ATD |
Advanced Technology Development |
BAR |
Basic and Applied Research |
CDR |
Critical Design Review |
CM |
Configuration Management |
CMM |
Capability Maturity Model½ |
CMMI |
Capability Maturity Model½ IntegrationSM |
CoF |
Construction of Facilities |
ConR |
Continuation Reviews |
CR |
Confirmation Review |
DAU |
University |
DGA |
Designated Governing Authority |
DR |
Decommissioning Review |
ECP |
Engineering Change Proposal |
ECR |
Environmental Compliance and Restoration |
EEE |
Electrical, Electronic, and Electromechanical |
EMC |
Electromagnetic Compatibility |
EMI |
Electromagnetic Interference |
EPR |
Engineering Peer Reviews |
FAD |
Formulation Approval Document |
FMEA |
Failure Modes and Effects Analysis |
FRR |
Flight Readiness Review |
FS&GS |
Flight Systemsßand Ground Support |
GPMC |
Governing Program Management Committee |
ICD |
Interface Control Document |
ICWG |
Interface Control Working Group |
INCOSE |
International Council on SystemsßEngineering |
IP |
Institutional Projects |
IPD |
Integrated Product Development |
IPPD |
Integrated Product and Process Development |
KPP |
Key Performance Parameter |
LLIL |
Limited Life Items List |
MCR |
MissionßConcept Review |
MD |
MissionßDirectorates |
MDAA |
Mission ßDirectorateßAssociate Administrator |
MDR |
Mission Design Review |
MOE |
Measures of Effectiveness |
MOP |
Measures of Performance |
MSOA |
Mission Support Office Approval |
MSOD |
MissionßSupport OfficeßDirector |
NAR |
Non-Advocate Review |
NODIS |
NASA On-Line Directives Information System |
NPD |
NASA Policy Directive |
NPR |
NASA Procedural Requirements |
OCE |
Office of the Chief Engineer |
ORR |
Operational Readiness Review |
PA |
Portfolio Approval |
PDR |
Preliminary Design Review |
PHA |
Preliminary Hazard Analysis |
PM |
Program or Project Manager |
PMP |
Program Management Plan |
PNAR |
Pre-Non-Advocate Review |
PP |
Project Plan |
PR |
Procedural Requirements |
PTR |
Periodic Technical Reviews |
RFA |
Requests for Action |
RFP |
Request for Proposal |
RID |
Review Item Discrepancy |
SAR |
SystemsßAcceptance Review |
SDP |
Software Development Plan |
SDR |
SystemßDefinition Review/System Design Review |
SE |
SystemsßEngineering |
SEMP |
SystemsßEngineeringßManagementßPlan |
SE NPR |
SystemsßEngineeringßNASA Procedural Requirements |
SEWG |
SystemsßEngineeringßWorking Group |
S&MA |
Safety and Mission Assurance |
SRR |
SystemßRequirementsßReview |
TPM |
Technical Performance Measures |
TRL |
Technology Readiness Level |
TRR |
Test Readiness Review |
WBS |
Work Breakdown Structure |
xPR |
(Center) Procedural Requirementsß |