Subject: Implementing the National Environmental Policy Act and Executive Order 12114 (Revalidated with Change 1 on 9/6/2017)

Responsible Office: Office of Strategic Infrastructure


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppdendixA | AppendixB | AppendixC | AppendixD | ALL |

Appendix D. Flow Charts of the NEPA Process

Appendix D flow charts depict the NEPA Process. Figure D-1 show the summary of the NEPA Process.
Figure D-1 Summary of the NEPA Process

Appendix D flow charts depict the NEPA Process. Figure D-2 show the Summary of the Process for Categorical Exclusion Determination.
Figure D-2 Summary of the Process for Categorical Exclusion Determination

Appendix D flow charts depict the NEPA Process. Figure D-3 show the Summary of Typical Environmental Assessment Process
(Assumes EA Will Lead to FONSI)
Figure D-3 Summary of Typical Environmental Assessment Process (Assumes EA Will Lead to FONSI)

Appendix D flow charts depict the NEPA Process. Figure D-4 show the Summary of Environmental Impact Statement Preparation Process.
Figure D-4 Summary of Environmental Impact Statement Preparation Process



| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | AppdendixA | AppendixB | AppendixC | AppendixD | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.