NPR 8820.2H
Effective Date: September 27, 2022
Expiration Date: September 27, 2027
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES
Printable Format (PDF)

Subject: Facility Project Requirements (FPR) (Updated w/Change 1)

Responsible Office: Office of Strategic Infrastructure


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |

Appendix B. Acronyms

A/E or A-E Architect-Engineer
AA Associate Administrator
ABA Architectural Barriers Act
ADA Americans with Disabilities Act
ADPM Agency Demolition Program Manager
AED Automated External Defibrillators
AFPCE Approved Facility Project Cost Estimate
AHJ Authority Having Jurisdiction
AMP Agency Master Plan
ANSI American National Standards Institute
ARC Ames Research Center
ARPA Archeological Resources Protection Act
ARRA American Reinvestment and Recovery Act (2009)
ASBCA Armed Services Board of Contract Appeals
ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers
ASTM American Society for Testing Materials
ATF Armstrong Test Facility (Component Facility, Glenn Research Center)
BCA Building Commissioning Association
BIM Building Information Model or Modelling
BIPV Building-Integrated Photovoltaics
BMP Best Management Practices
BTU British Thermal Units
BY Budget Year
CA Commissioning Authority
CAD Computer-Aided Design
CAM Control Account Manager
CAS Cross Agency Support (fund/budget term)
CatEx Categorical Exclusion
Cat C Category C Project
CBM Condition-Based Maintenance (or Continuous-Based Monitoring)
CCB Change Control Board
CCE Current Cost Estimate
CCI Consolidated Contract Initiative
CCTV Closed Circuit Television Systems
CDF Capitalization Determination Form
CDPM Center Demolition Program Manager
CECR Construction, Environmental Compliance and Restoration (Fund that includes Institutional and Programmatic CoF; and Environmental)
CEQ Council on Environmental Quality
CFIP Capitol Facilities Investment Program
CFO Chief Financial Officer
CFR Code of Federal Regulations
CII Construction Industry Institute
CIPP Capital Improvement Program Plan
CJ Congressional Justification
CMc Construction Manager as Constructor
CM&O Center Management and Operations
CMMS Computerized Maintenance Management System
CMr Construction Manager At Risk
CNM Center NEPA Manager
CO Change Order or Contracting Officer
COBie Construction-Operations Building Information Exchange
CoF Construction of Facilities
COR Contracting Officer's Representative
COSS Center Operations Support Services
CPARS Contractor Performance Assessment Reporting System
COTR Contracting Officer Technical Representative
CPG Comprehensive Procurement Guidelines
CPM Critical Path Method
CR Continuing Resolution
CRM Cultural Resource Manager (previously Historic Preservation Officer)
CRV Current Replacement Value
CSI Construction Specification Institute
CUI Controlled Unclassified Information
Cx Commissioning
CY Calendar Year
DB Design-Build (contract)
DBT Design-Basis Threat
DFRC Dryden Flight Research Center
DHS Department of Homeland Security
DMA Deferred Maintenance Assessment
DoD Department of Defense
DOE Department of Energy
DSN Deep Space Network (Component Facility, JPL)
EA Environmental Assessment
ECIC Engineering and Construction Innovation Committee
EC&R Environmental Compliance and Restoration
EDD Environmental Due Diligence
EE Engineering Estimate
EEO Equal Employment Opportunity
EIS Environmental Impact Statement
EISA Energy Independence and Security Act
EMCS Energy Management Control Systems
E.O. Executive Order
EPA Environmental Protection Agency
EPACS Enterprise Physical Access Control Systems
EPM Executive Project Manager
EPR Estimated Price Report
ESA Exploration, Science and Aeronautics or Endangered Species Act
ESCO Energy Service Company
ESPC Energy Savings Performance Contract
EUL Enhanced Use Lease (or Leasing)
EVM Earned Value Management
EXC Exploration Capability
FAD Funding Approval Document
FAI Federal Acquisition Institute
FAR Federal Acquisition Regulation
FASAB Federal Accounting Standards Advisory Board
FCP Facility Closure Plan
FEMP Federal Energy Management Program
FEP Front-End Planning
FERP Facilities Engineering and Real Property Division
FF&E Fixtures, Finishes and Equipment
FMEA Failure Modes and Effects Analysis
FMM Financial Management Manual
FMP Facilities Master Plan
FMS Facilities Management System
FONSI Finding of No Significant Impact
FP&D Facility Planning and Design
FPB Facilities Program Board (now defunct)
FPM Facility Project Manager
FPMP Facility Project Management Plan
FPN Facility Project Number
FPR Facility Project Requirements or Facility Project Review
FPT Functional Performance Tests
FRB Facilities Review Board (now defunct)
FRD Facility Requirements Document
FRED Facilities and Real Property Division (NASA Headquarters)
FSC Federal Supply Catalog
FS&GS Flight System and Ground Support
FSMP Facility Safety Management Plan
FUO Facility Utilization Officer
FURB Facility Utilization Review Board
FY Fiscal Year
G&A General and Administrative
GBA Green Building Advisor
GBI Green Building Institute (for Green Globes)
GFE Government-Furnished Equipment
GFP Government-Furnished Property
GIS Geospatial Information System
GMP Guaranteed Maximum Price
GRC Glenn Research Center
GSA General Services Administration
GSE Ground Support Equipment
GSFC Goddard Space Flight Center
HASP Health and Safety Plan
HABS Historic American Buildings Survey
HAER Historic American Engineering Record
HSF Human Space Flight
HQ Headquarters (NASA)
HUD U. S. Department of Housing and Urban Development
HVAC Heating, Ventilation, and Air-Conditioning
IAQ Indoor Air Quality
IBC International Building Code
ICC International Code Council
IDIQ Indefinite Delivery, Indefinite Quantity
IDS Intrusion Detection System
IEQ Indoor Environmental Quality
IESNA Illuminating Engineering Society of North America
IFB Invitation for Bid
IOP Integrated Operations Plan or Initial Operating Plan
ISC Interagency Security Committee
ISDL Institutional Safety Discipline Leads
IST Integrated Systems Test
IT Information Technology
IV&V Independent Verification and Validation Facility (Component Facility, GSFC)
JOFOC Justification for Other than Full and Open Competition
JPL Jet Propulsion Laboratory
JSC Johnson Space Center
KDP Key Decision Points
KIC Knowledge Information Center
KSC Kennedy Space Center
LAPM Local Authority Project Manager (unique to KSC)
LaRC Langley Research Center
LCCA Life-Cycle Cost Analysis
LEED Leadership in Energy and Environmental Design
LLIS Lessons Learned Information System
LS Lump Sum
M&O Maintenance and Operations
MACC Multiple Award Construction Contract
MAF Michoud Assembly Facility (Component Facility, MSFC)
MRC Minor Revitalization and Construction
MRI Mission Relevancy Index (Replaces Mission Dependency Index - MDI)
MdM Meta-data Management
MS Mission Support
MSC Mission Support Council
MSD Mission Support Directorate
MSFC Marshall Space Flight Center
N/A Not Applicable
NAGPRA Native American Graves Protection and Repatriation Act
NAIS NASA Acquisition Internet Service
NASA National Aeronautics and Space Administration
NAVFAC Naval Facilities
NC New Construction
NCS National CAD Standard
NEHRP National Earthquake Hazard Reduction Program
NEPA National Environmental Policy Act
NF NASA Form
NFPA National Fire Protection Association
NFS NASA FAR Supplement
NHPA National Historic Preservation Act
NIBS National Institute of Building Services
NID NASA Interim Directive
NIPR NASA-Interagency Purchase Request
NIST National Institute of Standards and Technology
NODIS NASA Online Directives Information System
NOJMO NASA Office of JPL Management and Oversight
NPD NASA Policy Directive
NPG NASA Procedures and Guidelines
NPR NASA Procedural Requirement
NRC National Research Council
NSBF National Scientific Balloon Facility
NSPE National Society of Professional Engineers
NSS NASA Safety Standard
NTP Notice to Proceed
OA Office of the Administrator
OCFO Office of the Chief Financial Officer
OMB Office of Management and Budget
OMC Operations Management Council (being replaced with the MSC)
OMFIT Operations and Maintenance Facilities Innovations Committee
OP Operating Plan
OPC Operating Plan Change
OSHA Occupational Safety and Health Administration
OSI Office of Strategic Infrastructure
P&ID Piping and Instrumentation Diagram
PA Programmatic Agreement
PA&E Office of Program Analysis and Evaluation
PAM Partnership Agreement Maker
PCSD President's Council on Sustainable Development
PD Program Direct
PDRI Project Definition Rating Index
PER Preliminary Engineering Report
PES Preliminary Environmental Survey
PGM Programmed Maintenance
PMC Program Management Council
PM Preventive Maintenance
PMP Project Management Plan
PP&E Property, Plant and Equipment
PPBE Programming, Planning, Budgeting and Execution
PPBES Programming, Planning, Budgeting and Execution System
PR Procurement Request
PRG Program Resource Guidance
PT&I Predictive Testing and Inspection
PY Program Year
QA Quality Assurance
R&D Research and Development
RAC Risk Assessment Code (Used by Safety and Health)
RbyIR Renewal by Incremental Repair
RCB&EA Reliability Centered Building and Equipment Acceptance
RCM Reliability- Centered Maintenance
RCRA Resource Conservation and Recovery Act
RECO Real Estate Contracting Officer
REV Review or Revision
RFI Request for Information
RFP Request for Proposal
RFQ Request for Quote
RG Resource Guidance
ROD Record of Decision
ROI Repair of Obsolete Items
RPAO Real Property Accountable Officer
RPMP Real Property Management Plan
RPMS Real Property Management System
SAP NASA's Core Financial System (Software Package)
SBIC Sustainable Buildings Industry Council
SBPD Summary Brief Project Document
SCAP Strategic Capabilities Asset Program
SEMP Systems Engineering Management Plan
SF Standard Form or Subcontractor-Furnished or Square Feet
SHPO State Historic Preservation Office
SIES Supervision, Inspection, and Engineering Services
SII Strategic Investment Initiative
SMACNA Sheet Metal and Air Conditioning National Association
SMC Strategic Management Council
SME Subject Matter Expert
SOW Statement of Work
SpecsIntact Specifications-Kept-Intact
SPG Strategic Planning Guidance
SR Service Request
SS Special Studies
SSA Source Selection Authority
SSC Stennis Space Center
STE Special Test Equipment
SUB Subcontractor
TAB Testing, Adjusting, and Balance
TBCx Total Building Commissioning
TC Trouble Call
TCRPMD Technical Capabilities and Real Property Management Division
TM Technical Manual
UCS Utilities Control System
UESC Utility Energy Service Contract
UPN Unique Project Number
USACE United States Army Corp of Engineers
U.S.C. United States Code
USDA U. S. Department of Agriculture
USGBC U. S. Green Building Council
VA Value Assessment
VE Value Engineering
VM Value Management (incorporates Value Engineering and Value Assessment)
WBDG Whole Building Design Guide
WBS Work Breakdown Structure (or Work Breakdown Structure number)
WFF Wallops Flight Facility (Component Facility, GSFC)
WSTF White Sands Test Facility (Component Facility, JSC)
YR Year


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.