| NODIS Library | Program Management(8000s) | Search |

NASA Ball NASA
Procedural
Requirements
NPR 8820.2H
Effective Date: September 27, 2022
Expiration Date: September 27, 2027
COMPLIANCE IS MANDATORY FOR NASA EMPLOYEES
Printable Format (PDF)

Subject: Facility Project Requirements (FPR) (Updated w/Change 1)

Responsible Office: Office of Strategic Infrastructure


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |

Preface

P.1 Purpose

This NASA Procedural Requirements (NPR) provides the minimum requirements for planning, approving, and acquiring all NASA Facility Projects with an approved facility project cost estimate (AFPCE) for construction of $100,000 or greater (excluding maintenance work). This document implements the criteria established in the NASA Policy Directive (NPD) 8820.2, Design and CoF, by supplementing the policies and requirements per NPD 7120.4, NASA Engineering and Program/Project Management Policy and per NPR 7120.7, NASA Information Technology (IT) Program and Project Management Requirements, with specific facility planning, design, construction, and commissioning requirements.

P.2 Applicability

a. This NPR applies to NASA Headquarters (HQ) and NASA Centers, including Component Facilities and Technical and Service Support Centers, for all sources of construction funding including CoF funding provided by Programs. In addition, this NPR applies to the Jet Propulsion Laboratory (JPL), a Federally-funded research and development center, and other contractor facilities to the extent specified or referenced in their contracts. For the rest of this document, the term "Centers" refers to NASA Centers, Component Facilities, and JPL. It also applies to non-NASA-owned facilities constructed on NASA real estate unless the NASA HQ Facilities and Real Estate Division (FRED) waives the requirement.

b. In this NPR, all mandatory actions (i.e., requirements) are denoted by statements using the term "shall." The terms: "may" or "can" denote discretionary privilege or permission, "should" denotes a good practice and is recommended but not required, "will" denotes expected outcome, and "are/is" denotes descriptive material.

c. All document citations in this NPR refer to the latest version of the document unless otherwise noted.

d. Documents cited as authority, applicable, or reference documents may be cited as a different categorization, which characterizes its function in relation to the specific context.

P.3 Authority

a. Utility incentive programs, 42 United States Code (U.S.C.) § 8256 (c).

b. Authority to enter into contracts, 42 U.S.C. § 8287.

c. The National Aeronautics and Space Act, as amended, 51 U.S.C. § 20113 et seq.

d. Lease of Non-excess Property, 51 U.S.C. § 20145.

e. National Historic Preservation Act (NHPA), as amended, 54 U.S.C. § 300101 et seq.

f. NPD 8820.2, Design and Construction of Facilities.

P.4 Applicable Documents and Forms

a. Duties of Executive Agencies, 40 U.S.C. § 524.

b. Architectural Barriers Act (ABA) of 1968, 42 U.S.C. 4151 et seq.

c. Federal Building Energy Efficiency Standards, 42 U.S.C. § 6834.

d. Federal Compliance, 42 U.S.C. § 6835.

e. Clean Air Act (CAA) Amendments of 1990 Title VI (Stratospheric Ozone and Global Climate Protection), 42 U.S.C. § 7401 et seq.

f. McKinney - Vento Homeless Assistance Act as amended, 42 U.S.C. § 11301 et seq.

g. Americans with Disabilities Act (ADA), 42 U.S.C. § 12131.

h. National Historic Preservation Act (NHPA) Section 106 Review, 54 U.S.C. § 306108.

i. The Davis-Bacon Act, as amended, Public Law (Pub. L.) 107-217, 116 Stat. 1062 (2002).

j. Interagency Security Committee, Executive Order (E.O.) 12977, 3 Code of Federal Regulations (CFR) 247 (1995).

k. Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, E.O. 14057.

l. Energy Efficiency Standards for the Design and Construction of New Federal Commercial and Multi- Family High-Rise Residential Buildings, 10 CFR pt. 433.

m. Energy Efficiency Standards for New Federal Low-Rise Residential Buildings, 10 CFR pt. 435.

n. Federal Energy Management and Planning Programs, Subpart A Methodology and Procedures for Life-Cycle Cost Analyses, 10 CFR 436.

o. Federal Acquisition Regulation (FAR), 48 CFR Chapter 1.

p. NASA FAR Supplement (NFS), 48 CFR pts. 1801-1872, Appendices A, B, and C.

q. Partnering, 48 CFR subpart 1836.70.

r. Office of Management and Budget (OMB) Circular A-11, Preparation, Submission and Execution of the Budget.

s. OMB Circular A-94, Guidelines and Discount Rates for Benefit-Cost Analysis of Federal Programs.

t. NPD 1000.0, NASA Governance and Strategic Management Handbook.

u. NPD 1000.3, The NASA Organization.

v. NPD 1600.2, NASA Security Policy.

w. NPD 7120.4, NASA Engineering and Program/Project Management Policy.

x. NPD 7330.1, Approval Authorities for Facility Projects.

y. NPD 8810.2, Master Planning for Real Property.

z. NPR 1441.1, NASA Records Management Program Requirements.

aa. NPR 1600.1, NASA Security Program Procedural Requirements.

bb. NPR 1620.2, Facility Security Level Determinations.

cc. NPR 1620.3, Physical Security Requirements for NASA Facilities and Property.

dd. NPR 2810.1, Security of Information Technology.

ee. NPR 7120.5, NASA Space Flight Program and Project Management Requirements.

ff. NPR 7120.7, NASA Information Technology Program and Project Management Requirements.

gg. NPR 7120.8, NASA Research and Technology Program and Project Management Requirements.

hh. NPR 8000.4, Agency Risk Management Procedural Requirements.

ii. NPR 8510.1, NASA Cultural Resources Management.

jj. NPR 8570.1, NASA Energy and Water Management Program.

kk. NPR 8580.1, Implementing the National Environmental Policy Act and E.O. 12114.

ll. NPR 8600.1, NASA Capability Portfolio Management Requirements.

mm. NPR 8715.1, NASA Safety and Health Programs.

nn. NPR 8715.3, NASA General Safety Program Requirements.

oo. NPR 8800.15, Real Estate Management Program.

pp. NPR 8810.1, Center Master Planning.

qq. NPR 8831.2, Facilities M&O Management.

rr. NPR 9250.1, Property, Plant, and Equipment and Operating Materials and Supplies.

ss. NPR 9420.1, Budget Formulation.

tt. NASA-STD-10001, NASA Building Information Modeling (BIM) Scope of Services and Requirements for Architects and Engineers.

uu. NASA-STD-10002, NASA Facility Design Standard.

vv. NASA-STD-8719.7, Facility System Safety Guidebook.

ww. NASA-STD-8719.11, NASA Safety Standard for Fire Protection.

xx. NASA Business Case Guide for Real Property and Facilities Project Investments.

yy. Construction of Facilities: NASA Partnering Desk Reference.

zz. Reliability Centered Building and Equipment Acceptance Guide.

aaa. American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) Guideline 0, The Commissioning Process, ASHRAE.

bbb. American National Standards Institute (ANSI)/ASHRAE Standard 55-2020, Thermal Environmental Conditions for Human Occupancy.

ccc. ANSI/ASHRAE Standard 62.1-2019, Ventilation for Acceptable Indoor Air Quality.

ddd. ANSI/Sheet Metal and Air Conditioning National Association (SMACNA) 008-2008, Indoor Air Quality (IAQ) Guidelines for Occupied Buildings Under Construction.

eee. Guiding Principles for Sustainable Federal Buildings and Associated Instructions, Council on Environmental Quality.

fff. Making Zero Accidents a Reality (Best Practice), Construction Industry Institute (CII) Best Practices.

ggg. Montreal Protocol on Substances that Deplete the Ozone Layer, United States (U.S.) Department of State.

P.5 Measurement/Verification

a. FRED verifies compliance with the requirements of this NPR by conducting annual CoF program reviews at Centers. For the CoF reviews, FRED identifies a random selection of CoF projects from the Centers and then reviews project documentation and interviews project managers and project stakeholders for those projects. In addition, Centers document compliance with this NPR by completing a Compliance Matrix (Appendix C) for every facility project and submitting the completed Compliance Matrix to FRED upon request.

b. FRED provides oversight of CoF projects through the designated role of Executive Project Manager (EPM). The EPM provides high-level support and guidance to Center Facility Project Managers (FPMs) for projects that represent a potential of high financial risk to the Agency.

P.6 Cancellation

NPR 8820.2G, Facility Project Requirements (FPR), dated June 05, 2014.



| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.