Subject: Facility Project Requirements (FPR) (Updated w/Change 1)

Responsible Office: Office of Strategic Infrastructure


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |

Appendix H. Facility Project Documentation Requirements

The following chart identifies the required facility project documentation to be uploaded into the FRED- approved database for:

Institutional CoF Projects - For the facility project formulation phase and for Center funding requests for subsequent phases.

Program-Direct CoF Projects - For the facility project formulation phase and for the construction phase upon funding transfer into the CECR Account.

- For the facility project formulation phase.

Project Type Formulation Final Design Construction
Institutional CoF Program
Renewal NF-1509 Updated NF-1509 Updated NF-1509
Quad Chart Updated Quad Chart Updated Quad Chart
LCCA (ECONPACK) Updated Project Narrative Updated Project Narrative
Project Narrative Updated LCCA (ECONPACK) Updated LCCA (ECONPACK)
Missing items from formulation Compliance Matrix
Project Management Plan (Discrete)
Missing items from formulation
Repair NF-1509 Updated NF-1509 Updated NF-1509
Quad Chart Updated Quad Chart Updated Quad Chart
Risk Assessment (Normalized) Updated Project Narrative Compliance Matrix
Project Narrative Missing items from formulation Project Management Plan (Discrete)
LCCA (ECONPACK) Missing items from formulation
Demolition NF-1509 Updated NF-1509 Updated NF-1509
Quad Chart (CRV > $20M) Updated Quad Chart (CRV > $20M) Updated Quad Chart (CRV > $20M)
HUD/NHPA Screening Reports Missing items from formulation Compliance Matrix
Approved Disposal Letter (Signed) Project Management Plan (Discrete)
Missing items from formulation
Energy NF-1509 Updated NF-1509 Updated NF-1509
Project Narrative Updated Quad Chart (if required) Updated Quad Chart (if required)
Quad Chart Updated Energy Fields Project Management Plan (Discrete)
LCCA
Energy fields in Formulation Tab
Supplemental Damage Assessment Document NF-1509 Updated NF-1509
Other info. as required by FRED Other info. as required by FRED Compliance Matrix
Project Management Plan (Discrete)
Other info. as required by FRED
Program-Direct CoF
Repair (per NPR 8831.2) NF-1509 N/A (Design funding from Program) N/A (Constr. funding from Program, no transfer into CECR required)
All Other Projects NF-1509 Program-funded design documentation (FRED to identify on a Funding Approval Document) Updated NF-1509
Quad Chart Updated Quad Chart
LCCA (ECONPACK) Compliance Matrix
Project Narrative Project Management Plan
Local Projects
Repair (per NPR 8831.2) NF-1509 N/A (Design funded locally) N/A (Construction funded locally, no transfer into CECR required)
Quad Chart
All Other Projects NF-1509 (For Information Only, AFPC < $1M) N/A (Design funded locally) N/A (Construction funded locally)


| TOC | ChangeHistory | Preface | Chapter1 | Chapter2 | Chapter3 | Chapter4 | Chapter5 | Chapter6 | Chapter7 | ApppendixA | AppendixB | AppendixC | AppendixD | AppendixE | AppendixF | AppendixG | AppendixH | AppendixI | AppendixJ | AppendixK | ALL |
 
| NODIS Library | Program Management(8000s) | Search |

DISTRIBUTION:
NODIS


This document does not bind the public, except as authorized by law or as incorporated into a contract. This document is uncontrolled when printed. Check the NASA Online Directives Information System (NODIS) Library to verify that this is the correct version before use: https://nodis3.gsfc.nasa.gov.